My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 07-15-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
07-15-2014
>
6.1. ERMUSR 07-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2019 1:01:14 PM
Creation date
7/15/2014 12:34:00 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
part of the Conference,please let me know as soon as possible. The conference brochure <br /> is attached. <br /> • The Minnesota Municipal Power Agency(MMPA)Annual Meeting and Dinner will be <br /> held in North St. Paul this year on Tuesday, July 22. The next MMPA board meeting <br /> will be held in prior to the annual meeting. <br /> • I have been working with City staff to help Sherburne County apply for MN Shovel <br /> Ready Certification. <br /> • Utilities, City, and Sherburne County staff met to review comments from the DNR on the <br /> Elk River Dam Emergency Action Plan that was approved by the Commission and <br /> Council last month. The DNR comments will result in an EAP revision. This will be <br /> brought back to the Commission at a future meeting. <br /> • I have begun the process for manager annual reviews. Because of the heavy workload, <br /> we will work to coordinate the review times as needed for each of the managers. <br /> • Before wrap-up and final inspection of the most recent Sprint antenna upgrade to three of <br /> ERMU's water tower has been completed, Sprint has contacted me to discuss their next <br /> round of upgrades. These new upgrades may require lease agreement revisions or <br /> addendums because of the increased number of attachments. It would appear that this <br /> will be an ongoing process with continual upgrade projects. The result for ERMU may <br /> be additional compensation for attachments but also additional administration, plan <br /> review, inspection, and legal labor. <br /> On a similar note, Verizon has been working with staff and our engineering consultant on <br /> their installations to our Gary Street and Johnson Street water towers. <br /> • Along with City staff, I will be participating in a City Council Candidates and Staff Info <br /> Meeting. This is an opportunity to meet the candidates and provide an overview the <br /> Utilities and what role we play in city government. I really appreciate the Cal Portner, <br /> the City Administrator, includes ERMU in the meeting. This is a great opportunity to <br /> showcase our relationship with the City and our value to the community. <br /> • American Public Power Association(APPA)recently released a new video, Meet the <br /> APPA Government Relations Team. The video highlight APPA's work to represent <br /> public power interests on behalf their member municipal utilities. Some of this video <br /> was recorded during their Legislative Rally in Washington D.C. earlier this year. John <br /> Dietz, Daryl Thompson, and I attended this APPA event. All three made the video. The <br /> video can be found at: http://videos.publicpower.org/meet-the-appa-government- <br /> relations-team <br /> • Great River Energy has begun the demolition of their old headquarters building in Elk <br /> River. Attached are some pictures of the work in process. <br /> POWERED 11 <br /> - Page 2 of 3 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.