My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 07-15-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
07-15-2014
>
6.1. ERMUSR 07-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2019 1:01:14 PM
Creation date
7/15/2014 12:34:00 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> July 15, 2014 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered 2 new residential water meters. <br /> • Sealed the water meter and took curb stop ties from 5 water services. <br /> • Shut off 3 water services and 3 electric services, also turned on 4 water services and 4 <br /> electric services. <br /> • Went on 6 service calls. <br /> • Completed 3 locates. <br /> • Completed 25 BACTIITota1 Chlorine Residual Samples; all confirmed negative for <br /> Coliform Bacteria. <br /> • Completed 20 routine fluoride samples. All samples met MDH standards. <br /> • Angela worked with the controls company to complete the SCADA upgrades to Well#7. <br /> The backwash system is now repaired and working like it should be working. The <br /> upgrades also included updating the controls at Well#9, which allows Well#8 to be <br /> controlled from Well#9. <br /> • We are continuing to sell rain barrels to customers who want to conserve water. 26 of the <br /> 40 rain barrels have been sold so far. <br /> • 154 fire hydrants have had maintenance performed on them so far this summer. A <br /> number of private hydrants are included in that number. I've attached a picture of what <br /> the private hydrants look like when the maintenance is completed. <br /> • We had some warranty work completed on the Gary Street Water Tower. Some of the <br /> roof was missed when the final coat was applied in 2011. I worked with Kelly Mulhern <br /> and Classic Coatings to get the work completed. The missing section constituted about <br /> 25%of the roof. <br /> • Pete has completed 350, of the over 800 curbstop ties, that are missing from our curbstop <br /> ties catalog. It's a daunting task and he's making great progress. <br /> • Mike and I climbed the Jackson Street water tower to paint over some graffiti on June <br /> 18th. We did file a police report. <br /> POWERED 0Y <br /> Page 1 of 2 <br /> NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.