Laserfiche WebLink
Figure D-2: Final Mix Design <br /> Aggregate Moisture Calculator <br /> Mix <br /> Target Yield Override(IbICWT) ' <br /> Historical target yield(ibtCW) 626 <br /> Mix design yield(1bICWT) 495 <br /> (Total Paste Volume I 10.60 f <br /> Aggregate Ratio <br /> 314"CA,#67 Rock <br /> Foe Agg.,Washed Sand <br /> Total Aggregate 100% <br /> must e.u al 100% <br /> X to calculate water without <br /> considering admixtures: u ; <br /> Cost ! Ton: $33.90 <br /> Cost !yd3: $65.29 <br /> Material Selection - `. <br /> Cement <br /> SCf #! .r " " f Moisture Adjusted Batch Size Calculator <br /> Skate Park SCC <br /> SCM#2 � � � � Batch Size(1,1.5,2,Etc.) <br /> Agg.#1 .. - ..��" <br /> Agg. a x ", .- Cement,Type I-A 29.63 is <br /> Agg #3xr <br /> Agg.#4 ' <br /> Admix#1 314"CA;#67 Rock 51.31 lbs <br /> Admix#2 Ms m , . .�, fine Agg.,Washed Sand 51.65 lbs <br /> Admix#3=: �� � ,r; '�, <br /> Admix#4, , <br /> Admix#5". N <br /> r . Water 1.17 gallons <br /> Admix#ii <br /> i i i iii iii.;•�i i i i i f A <br /> Water 9.78 lbs <br /> Pilot Area=iiix oas le,, :: %���/��I�//%���///�/� /�///�li <br /> Air Entrainer 0.9 oz <br /> HRWR 3.0 02 <br /> Viscosity modifier 0.9 oz <br /> Trutt Area Betd See" <br /> D-2 <br />