My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 EDSR 06-16-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2014
>
06-16-2014
>
6.1 EDSR 06-16-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 7:57:57 AM
Creation date
6/12/2014 1:16:09 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!f 1 ,; I. <br /> Becker Industrial Park <br /> Becker,Minnesota <br /> NTT Project 11.50565.100 <br /> Our drill crew did not observe free groundwater during or after drilling operations. The sand soils <br /> at this site are conducive to groundwater flow. We do not anticipate groundwater to affect the <br /> proposed construction at this site. <br /> Oro <br /> In our opinion,the two parcels are well suited for the proposed construction. Prior to construction, <br /> the topsoil should be stripped and removed from the building pad and pavement areas. Our borings <br /> indicate that the topsoil extends to approximately 6 to 10 inches below existing grade. <br /> The soil borings performed at this time were for preliminary information purposes only. We <br /> recommend that project specific geotechnical exploration(s)be performed prior tl0 construction at <br /> the parcels. <br /> Remarks&Sfgr lard of Care <br /> The conclusions in this correspondence represent our professional opinion(s),based on our <br /> interpretation of the site conditions and information provided to us by others. These opinions were <br /> arrived at in accordance with currently accepted engineering practices at this time and location. <br /> Other than this,no warranty is implied or intended. <br /> Call if you have any questions concerning this correspondence. We may be reached at(763)433- <br /> 9175. <br /> Northern Technologies Inc. <br /> Anthony Francis,P.E. <br /> Project Engineer <br /> Stephen Johnston,P.E. <br /> Principal Engineer <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.