Laserfiche WebLink
!f 1 ,; I. <br /> Becker Industrial Park <br /> Becker,Minnesota <br /> NTT Project 11.50565.100 <br /> Our drill crew did not observe free groundwater during or after drilling operations. The sand soils <br /> at this site are conducive to groundwater flow. We do not anticipate groundwater to affect the <br /> proposed construction at this site. <br /> Oro <br /> In our opinion,the two parcels are well suited for the proposed construction. Prior to construction, <br /> the topsoil should be stripped and removed from the building pad and pavement areas. Our borings <br /> indicate that the topsoil extends to approximately 6 to 10 inches below existing grade. <br /> The soil borings performed at this time were for preliminary information purposes only. We <br /> recommend that project specific geotechnical exploration(s)be performed prior tl0 construction at <br /> the parcels. <br /> Remarks&Sfgr lard of Care <br /> The conclusions in this correspondence represent our professional opinion(s),based on our <br /> interpretation of the site conditions and information provided to us by others. These opinions were <br /> arrived at in accordance with currently accepted engineering practices at this time and location. <br /> Other than this,no warranty is implied or intended. <br /> Call if you have any questions concerning this correspondence. We may be reached at(763)433- <br /> 9175. <br /> Northern Technologies Inc. <br /> Anthony Francis,P.E. <br /> Project Engineer <br /> Stephen Johnston,P.E. <br /> Principal Engineer <br /> Attachments <br />