My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 06-16-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
06-16-2014
>
4.5. SR 06-16-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2014 8:57:37 AM
Creation date
6/11/2014 2:18:50 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• BO L—TON & NA r== N K , I NCo <br /> Consulting Engineers & Surveyors <br /> 12224 Nicollet Avenue•Burnsville, MN 55337 <br /> Phone(952)890-0509• Fax(952)890-8065 <br /> www.bolton-menk.com <br /> BID EVALUATION FOR THE CONSTRUCTION OF THE <br /> WASTEWATER TREATMENT FACILITY IMPROVEMENTS <br /> CITY OF ELK RIVER, MINNESOTA <br /> Three (3) bids were received for the construction of the wastewater treatment facility <br /> improvements project. The bids ranged from $16,525,200 to $17,243,800. The apparent low, <br /> responsive and responsible bidder was Rice Lake Construction Group, of Deerwood, Minnesota. <br /> As presented in the attached Bid Tabulation, all of the bidders were within five (5) percent of <br /> each other and the two lowest bidders were within 2.5 percent of each other. <br /> The bid documents did not contain any wording or ambiguities so as to force the Contractors to <br /> build in additional contingencies. <br /> Since three (3) bids were received and the bids were within 5 percent of each other, we feel the <br /> specifications were not restrictive to force a non-competitive bid situation. <br /> The bid documents contained 700 calendar days after the Notice to Proceed to complete this <br /> project. This is sufficient construction time so that the Contractor would not have to work <br /> overtime or add any additional costs to complete this project. <br /> Therefore, we feel that the bids received were competitive and responsive and re-bidding of the <br /> project would not provide any cost savings. <br /> A brief historical background of Rice Lake Construction Group is presented in this paragraph. <br /> Rice Lake Construction Group has been in the construction business for 30 years and is based in <br /> Deerwood, MN. Rice Lake Construction Group does approximately $90 million worth of <br /> projects per year and specializes in water and wastewater treatment facilities. Rice Lake <br /> Construction Group has built more than 730 projects associated with water and wastewater <br /> treatment worth a total value of more than $1 billion. Bolton & Menk, Inc. has worked in the <br /> past with this contractor on wastewater and water treatment facility projects in various <br /> communities. <br /> G:\Elk River\T21.106811_Ramsey\7_Bidding_Contract_Does\Bldeval.doc <br /> DESIGNING FOR A BETTER TOMORROW <br /> Bolton&Menk is an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.