My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 05-20-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
05-20-2014 SPECIAL
>
6.1. ERMUSR 05-20-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 3:34:48 PM
Creation date
5/20/2014 3:34:48 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/20/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-I/ <br /> Elk Riv; r <br /> Munici •I a1 Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Mu cipal Utilities Commission Eric Volk- Water Superintendent <br /> John Dietz— • air <br /> Al Nadeau— ce Chair <br /> Daryl Thomps in—Trustee <br /> MEETING Dl TE: AGENDA ITEM NUMBER: <br /> May 20, 2014 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delive i•d 6 new residential water meters. <br /> • Sealed he water meter and took curb stop ties from 7 water services. <br /> • Shut o 14 water services and 2 electric services, also turned on 6 water services and 4 <br /> electri6 services. <br /> • Went ol 9 service calls. <br /> • Compl!ted 25 BACTI/Total Chlorine Residual Samples; all confirmed negative for <br /> Colifo ill Bacteria. <br /> • Compl!ted 20 routine fluoride samples. All samples met MDH standards. We also <br /> compl: ed our state mandated fluoride validation sample and are meeting our satisfactory <br /> treatma t levels. <br /> • The M. nesota Department of Health visited us last month to take sodium and sulfate <br /> sample: from all of our wells. This is a routine test that the Department of Health does. <br /> • All of r frozen services have thawed out. The last one to thaw out was Pearle Vision <br /> which 1 awed out on April 28. The final determination of how much it cost has not yet <br /> been d: ermined. Even though it was a stressful time for our customers and the water <br /> depa ent, we did get some positive feedback from our customers. Everyone was just <br /> really .ppy to have had water through the ordeal. <br /> • Mike, ngela, and Pete continued to work on Well#7. They removed and replaced all of <br /> the out:ated plumbing. The new sodium permanganate systems are all working well. <br /> • Pete stJ ed working on curbstop ties again. This project will take a while. We still have <br /> around :00 missing ties. <br /> • Darren eber scanned all of our paper maps using the new scanner in engineering. This <br /> will he I us finish the conversion to the new Bolton and Menk GIS web app. <br /> • We are aiting for Sprint to finish up the punch lists for the Gary Street and Johnson <br /> Street . tennae installations. The contracts are almost complete for the Verizon <br /> install. p <br /> ln'1 ions that will take place on the Gary Street and Johnson Street Towers. <br /> 'POWER <br /> OWERED I <br /> ni Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D To S E R V E <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.