Laserfiche WebLink
Recent Municipal Electric Initiatives <br /> and Accomplishments <br /> z. <br /> ® ELF °-- ,, • Rochester Public Utilities(RPU)passed the 2 megawatt <br /> ft, CHAR"NG S , , <br /> hours mark in electricity provided by its three electric vehicle <br /> p. ..„„,q charging stations. <br /> ,, iij ii► A • Southern Municipal Power Agency (SMMPA)working group, <br /> ` ---- ,,. .. comprised of member utility management, set goal for develop- <br /> - �`} `' ing a solar implementation strategy for SMMPA and its mem- <br /> bers with anticipated implementation in 2015. <br /> AESEeum- _��(:, I® <br /> ranKmr, <br /> dV • SMMPA and RPU began assessing potential community solar <br /> ow <br /> ��! .�,' designs in fall 2013. <br /> • In April 2014, Moorhead Public Service released a solar gar- <br /> den project planning amework and began the feasibility analysis phase. <br /> • 2014 purchase (leggy slative approval pending) of hydroelectric dam from Wausau Paper by Brainerd Pub- <br /> lic Utilities. Legislati e funding for improvements sought. <br /> • Brainerd Public Utilities converted 678 more electric meters and 478 <br /> more water meters to AMR in 2013, allowing 85%of customers now to view <br /> their energy and water usage online. <br /> , , , <br /> ��VC..`i ..1 • In April 2014,New Ulm Public Utilities will start a new Back Pressure <br /> ., r .. Steam Turbine system on its current steam production plant to generate <br /> `11.. ,•''''441�..; -- 2.8 million kWh per year from combined heat and power. (1.4%of New <br /> ,f' d ';^. ' 4' ' Ulm's power.) <br /> ' '.t' a14;1. - <br /> • Funding sought in 2013 and 2014 from Department of Natural Resources <br /> ,, and the Legislature for municipal hydropower dam renovation at Lanes- <br /> bozo Public Utilities. <br /> / • Worthington Public Utilities'back-up generation kept Worthington run- <br /> -- +, ping"off the grid”when 2013 ice storm knocked out transmission. <br /> • Redwood Falls Public Utilities upgraded existing 300 kW hydropower <br /> unit to 500 kW. Estimated production now over 1,000 MWH annually. <br /> • Construction cont .,ct awarded in March 2014 for Missouri River Energy Services's hydro-electric gen- <br /> erating facility at th I existing flood control dam on Lake Red Rock in Iowa to benefit all of its municipal <br /> utility members, inc ding those in Minnesota. <br /> •In Le Sueur,Minn:rota Municipal Power Agency began operation of its new biogas plant capable of pro- <br /> ducing up to 8 MW o electricity from agricultural by-products. <br /> `, - • Nine homes converted to`smart homes'by Shakopee Public <br /> Utilities (SPUC) where energy usage can be monitored and <br /> �r. .r"i , '- — controlled in real time via homeowner's tablet or smart phone. <br /> • ,� ,- Partially funded by a DER/MMUA grant. <br /> U. SPUC added an energy storage component to the wind and <br /> solar energy generation systems it had previously installed at <br /> A 4111' :� the Shakopee High School Environmental Learning Center. <br /> 105 <br />