My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10. SR 05-19-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
05-19-2014
>
4.10. SR 05-19-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2014 1:06:30 PM
Creation date
5/15/2014 10:35:24 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cody L. Holmes, P.E., <br /> Project Engineer <br /> Summary <br /> Education Mr. Holmes is a Project Engineer in Bolton&Menk's Ramsey office,joining <br /> Bachelor of science- the firm in 2006. He is responsible for the planning, design,and preparation <br /> Civil Engineering of construction plans and specifications for a variety of municipal and private <br /> North Dakota state University projects. Mr. Holmes also has extensive experience with on-site construction <br /> observation, contract administration, and material testing on Federal and State <br /> Registration Aid projects. <br /> Professional Engineer,Minnesota <br /> Mr. Holmes has experience with a variety of engineering tasks including basic <br /> Organizations design computations,preliminary layout and design, research and prepare rough <br /> American Society of Civil Engineers drafts of preliminary reports, and feasibility studies. He also assists with project <br /> design and preparation of plans and specifications,prepares cost and quantity <br /> Certifications take-off estimates, and performs detailed inspection and project documentation. <br /> MnDOT Certifications <br /> • Aggregate Production I Experience <br /> • Bituminous Street I <br /> • Bituminous Street II City of Big Lake <br /> • Concrete Field I TH 10 &CSAH 5 Intersection Reconstruction <br /> • Concrete Field 11 Federal & State Aid TH Intersection Reconstruction <br /> • Grading and Base I Constructed under Traffic with an ADT of 33,000 <br /> • Grading and Base II Construction Administration, Inspection, Material Testing, and <br /> • ADA Policy&Design Training Documentation <br /> U of M Certifications TH 10 &TH 25 Intersection Improvements <br /> • Erosion/Sediment Control- Federal & State Aid TH Intersection Reconstruction <br /> Design of SWPPP Construction under Traffic with an ADT of 33,000 <br /> • Erosion/Sediment Control-Site Design Engineer-Roadway, Drainage, and Staging <br /> Management Construction Administration, Inspection, Material Testing, and <br /> Documentation <br /> City of Watertown <br /> TH 25 ARRA Reconstruction Project <br /> • Federal and State Aid Funded Roadway Reconstruction <br /> • Construction Administration, Inspection, Material Testing, and <br /> Documentation <br /> City of Elk River <br /> 2011 Street Improvements <br /> • State Aid Funded Utility& Street Reconstruction <br /> • Construction Administration, Inspection, Material Testing, and <br /> Documentation <br /> City of Savage <br /> • Hamilton of Savage Phase 6 Utility Reconstruction <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.