Laserfiche WebLink
N <br />b <br />a <br />Elk River Comp ehensive Plan <br />----------- -- ------------------ <br />_M'L,�_ r <br />5 <br />x <br />q <br />.3 <br />F� <br />Ave <br />Construction of <br />® <br />Proposed Interchange <br />interchanges will <br />eliminate existing access <br />A <br />Proposed Underpass <br />points onto US 10 and US <br />165th Ave <br />169. Frontage roads are <br />Existing Interchange <br />also ro osed in locations <br />P P <br />■ <br />io <br />Existing Pedestrian Overpass <br />along the corridor, but are <br />not shown on this map. <br />■ <br />Interchange Search Area <br />Figure 6 -8. Proposed Highway Improvements (Long -Term) ---------- '1 <br />62 / Chapter 6: Transportation <br />