Laserfiche WebLink
insulation, installing new windows and doors <br /> • Modify or rehabilitate the housing unit to make it accessible for a disabled member of the <br /> household. Accessibility Improvements may include: structural, exterior, bathroom, <br /> kitchen and other improvements necessary to enable a handicapped person to function <br /> independently in the residential setting. <br /> • Landscaping <br /> • Garages/Outbuildings <br /> • Fences (new or repair) <br /> ♦—��i t i<bt ti �c c'.b rf1 <br /> • Water softeners <br /> • Decks/Patios(new) <br /> • Additions to structures and finishing of basements <br /> • Finishing basements <br /> • Other rehabilitation items found suitable by CMHP rehabilitation staff <br /> Loans may not be used to address any of the following (except for necessary replacement <br /> in connection with an eligible rehab item): <br /> • Freestanding or built-in kitchen appliances unless needed to meet HQS standards <br /> • Fireplaces or woodstoves (unless a health/safety issue) <br /> • Window/door coverings(curtains, blinds, etc.) <br /> • Air Conditioning (unless needed for medical purposes) <br /> • Recreational items (swimming pools,tennis courts, saunas) <br /> • is i ►.'a.gc.si.091:.QP. ilci .ll_►.tics ic01).. i.t11 __iin12rcY tNitll <br /> • D111-4ws s, sisjot.L1 units ti hold ..r. a(ety_issue] <br /> • ?ti(l unit) tie1414C Y.9.1CSti n44d4d 141.11llstlf <br /> • Work begun or completed before the date of the Notice to Proceed order <br /> • Improvements not consistent with established standards <br /> • The refinancing of any existing mortgage or debt <br /> Note: Above listed items may be part of a total project scope of work, but any costs with <br /> the items are required to be covered by owners match funds. <br /> 9. CONSTRUCTION PROJECT STEPS <br /> After approval of a homeowner's application, an initial inspection will be scheduled. CMHP <br /> staff will meet with homeowners and perform a visual Housing Quality Standards inspection and <br /> discuss the homeowner's wishes. After the initial inspection a lead based paint risk assessment <br /> will be requested. After the risk assessment is completed, CMHP will create a scope of work <br /> based on the initial inspection and the lead assessment report. Once the homeowner has approved <br /> the scope of work the project is ready to go out for bid. <br /> 4131 i 4.0 MAI <br />