My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. SR 02-23-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
02/23/2004
>
5.7. SR 02-23-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:26 AM
Creation date
3/5/2004 3:14:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMERCIAL REFRIGERATION SYSTEMS <br /> <br />SALES. SERVICE. INSTALLATION & REPAIR <br /> <br />Mark Rodor[9o- John Rodorigo <br /> Phone (2!8) 74g-3366 <br /> <br />104 East Chestnut Street · R O. Box 1066 <br /> Virginia, Minnesota 55792 <br /> <br />Ja'nuap/29, 2004 <br /> <br />Cib/of Elk River <br />Attn: Rich Czech <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: Elk River Ice Arena <br /> <br />Dear Rich, <br /> <br />We arepleased .to provide the Elk River ice Arena with the following quotes for the <br />Holmstein Equipment iocated in the adjoining facility for your review: <br /> <br />The Pressure Regulator was never installed with the existing equipment. It should be <br />Ynstalled to provide optimum heat reclaim for the snowmelt system and floor frost <br />protection system. <br />a. Hansen Pressure Regulator #HA4A-400 with 4" Socket Weld Flange Kit. jVlaterials (freight allowed) <br /> Installation $ 500.00 <br /> <br />The Evaporative Condenser, which w~s pa~ of the original equipment purchased <br />separately, was designed for a different wet bulb application. Tt should be replaced to <br />accommodate dry running at 35 degrees and below for each :~0 pounds higher head <br />pressure than design conditions, will require 5% more HP to crank the compressor over <br />and you will lose 2% iD refrigeration capacity. Upgrading to proper Evaporative <br />Condenser can be expected to have a 10% power reduction during summer operation. <br />a. BAC Evaporative Condenser #VC1-205 (freight allowed) <br />b. Znstallation $ 4,800-00 <br /> <br />Please note: Installation w~JJ.he~.one at the <br />Systems, Inc. is working(bn the oiler rink. <br /> <br />~,c nmercial Refrigeration 3ys~ems, Inc. ~ <br /> <br /> / <br /> <br />same time as Commercial Refrigeration <br /> <br />/vim <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.