Laserfiche WebLink
(03) Erosion Control. Prior to initiating any work on the site, the erosion control plan, Plan B, <br /> shall be implemented by the Developer and inspected and approved by the City or other regulating <br /> authority. The City may impose additional erosion control requirements if they are deemed necessary <br /> to protect the downstream waters of the state..All areas disturbed by the grading operations shall be <br /> stabilized per the MPCA NPDES Stormwater Permit for Construction Activity and the City MS4 <br /> permit. Seed shall be in accordance with the City's current seeding specification which will include <br /> temporary erosion control measures to provide ground cover as rapidly as possible. All seeded areas <br /> shall be fertilized, mulched, and watered as necessary for seed retention and growth. The parties <br /> recognize that time is of the essence in controlling erosion. If the Developer does not comply with <br /> the MPCA NPDES Stormwater Permit for Construction Activity, the City MS4 permit, with the <br /> erosion control plan and schedule, or supplementary instructions received from the City or other <br /> regulating authority, the City may take such action as it deems appropriate to control erosion. The <br /> City will endeavor to notify the Developer in advance of any proposed action,but failure of the City <br /> to do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer <br /> does not reimburse the City for any cost the City incurred for such work within ten (10) days, the <br /> City may draw down the letter of credit to pay any costs. No development, utility or street <br /> construction will be allowed and no building permits will be issued unless the plat is in full <br /> compliance with the approved erosion control plan. <br /> (04) Grading. The Subdivision shall be graded in accordance with the approved grading <br /> development and erosion control plan, Plan B. The plan shall conform to City specifications. <br /> Within thirty (30) days after completion of the grading the Developer shall provide the City with an <br /> "as constructed" grading plan certified by a registered land surveyor or engineer that all storm water <br /> treatment/infiltration basins and swales, have been constructed on public easements or land owned <br /> by the City. The "as constructed" plan shall include field verified elevations of the following: <br /> (a) cross sections of storm water treatment/infiltration basins; (b) location and elevations along all <br /> swales, wetlands, wetland mitigation areas if any, locations and dimensions of borrow <br /> areas/stockpiles, and installed "conservation area" posts; and (c) lot corner elevations and house <br /> pads, and all other items listed in City Code Section 30-416 (q) (1). The City may withhold issuance <br /> of building permits until the approved certified grading plan is on file with the City and all erosion <br /> control measures, including full vegetation of entire site, are in place as determined by the City <br /> Engineer. <br /> A certified as-built building pad survey must be submitted and approved for commercial, industrial <br /> or institutional developments prior to issuance of a building permit. <br /> (05) CleanUp. The Developer shall clean dirt and debris from all streets that has resulted from <br /> construction work by the Developer,home builders, subcontractors, their agents or assigns. Prior to <br /> any construction in the plat, the Developer shall identify in writing a responsible party and schedule <br /> for erosion control, street cleaning,and street sweeping. <br /> (06) National Pollutant Discharge Elimination System Requirements. Prior to the <br /> commencement of any work, the Developer shall provide a signed Storm Water Pollution <br /> Prevention Plan for City review and approval to control erosion from the site. Because the site is <br /> over one (1) acre, the Developer shall also apply for and obtain an NPDES permit from the <br /> Minnesota Pollution Control Agency. <br /> (07) Municipal Separate Storm Sewer System Requirements. All stormwater management <br /> activities shall comply with the City MS4 permit. <br /> 9 <br />