My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. ICESR 04-08-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2014
>
04-08-2014
>
7.4. ICESR 04-08-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2014 2:33:11 PM
Creation date
4/4/2014 2:33:10 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/8/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ICE ARENA—ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br /> Observations of Existing Conditions <br /> We toured the ice systems for both Rink 1 and Rink 2 with the <br /> facility's management and operating and maintenance staff and <br /> have the following observations and comments. <br /> Rink 1 (The Barn): <br /> • The operational season typically runs from the middle of <br /> September through middle of April. <br /> • Rink 1 is served by a direct refrigeration system <br /> manufactured by Holmsten Ice Rinks. The major of the <br /> components include two (2) 4 cylinder York compressors, <br /> one (1) low pressure receiver, two (2) pumper drum vessels <br /> and one (1) motor control center. The 31-year old <br /> refrigeration system has exceeded its expected life of 25-30 <br /> years. However, since this system only operates 6 months <br /> per year, the life span of the equipment is likely to be <br /> greater than 30 years. The system is in fair condition for its <br /> age, but, it's becoming more difficult to maintain with its <br /> outdated electrical and control systems, discontinued <br /> compressors units, etc. Some improvements have been <br /> performed on the refrigeration package over the years and <br /> include rebuilding compressors, new valves and insulation, <br /> new fill solenoids, float switches, top ends on compressors, <br /> dryer cores, replaced relief valves, and new ASME certified <br /> oil separator. <br /> • The existing evaporative condensing tower, was replaced in <br /> 2010 and is manufactured by Baltimore Aircoil (BAC). This <br /> system uses air and water to dissipate heat for the <br /> refrigeration processes. <br /> • There are no waste heat recovery systems on this <br /> refrigeration system. The existing snowmelt pit that is <br /> dedicated to Rink 1 is only used as a back-up and uses a <br /> boiler system to heat the water and melt the ice shavings. <br /> The primary pit is a common pit with Rink 2. There is no <br /> subfloor heating system beneath the rink floor. All waste <br /> heat is dissipated to the atmosphere, through the <br /> condensing tower. <br /> PIStevens 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.