My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.6. SR 03-17-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
03-17-2014
>
7.6. SR 03-17-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 10:20:04 AM
Creation date
3/14/2014 9:03:07 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is required so the City of Elk River can expand their <br /> existing treatment facility to meet new effluent <br /> permit limits from the MPCA and also accommodate <br /> { <br /> growth. The new permit limits and planned growth <br /> will require the City to expand existing processes <br /> and add new treatment processes. The existing <br /> wastewater treatment facility site is not large <br /> enough to accommodate the proposed <br /> improvements and requires the City to expand their ` <br /> facility to the south to accommodate the new V� <br /> processes. The expansion of the Wastewater <br /> Facility will consume an area currently used by GRE . <br /> for their outdoor storage of materials. Therefore, fir: ` <br /> GRE needs to construct another area on their site for � .. <br /> outdoor storage. <br /> What has changed to warrant the zone change? <br /> GRE is requesting to expand their property use at Figure 1- Vicinity Map <br /> this time due to the City's Wastewater Expansion <br /> Project that is set to be constructed in the summer of <br /> 2014 which will eliminate their current outdoor storage site <br /> area. <br /> Is the change consistent with the City of Elk River _ <br /> C Industrial Land use <br /> Comprehensive Plan? <br /> The City of Elk River's Comprehensive Plan shows the <br /> expansion project area for GRE as a part of a large <br /> industrial corridor along the east side of Highway 169. <br /> (See Figure 2) Industrial properties span from Main <br /> Street,just north of the expansion site, south to 1651 h - <br /> Avenue NW. Eerr. <br /> The site outlined near the northern edge of this <br /> industrial corridor has a future land use of Industrial and <br /> is consistent with the Comprehensive Plan. The <br /> proposed use also contributes to several of the overall t. _ _I' <br /> goals and Vision outlined in the Comprehensive Plan; <br /> lot <br /> Figw,E Land Use wthm the <br /> Comprehensive Plan <br /> Page 215 <br /> Great River Energy—Outdoor Storage Narrative <br />
The URL can be used to link to this page
Your browser does not support the video tag.