My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 03-17-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
03-17-2014
>
7.1. SR 03-17-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 10:10:11 AM
Creation date
3/14/2014 8:20:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
separate requirement for gymnasium space. There are eight proposed classrooms, requiring 16 parking <br /> stalls. The school has 76 parking spaces available for their use. <br /> Drop Off/Pick Up <br /> Bus loading and unloading will take place on the south side of the building directly adjacent to the <br /> sidewalk. Parent drop off can occur in two locations: on the backside of the building (loading dock area) <br /> and on the east side of the building. Parent pick up will only occur on the east side of the building. <br /> Sheet A1.0 (conceptual site plan) illustrates these locations. <br /> Circulation and Access <br /> Access to the site will be via two existing locations, one on the north side of the property and the second <br /> on the south side of the property. These two access point service all properties in the area contained by <br /> Industrial Circle and Twin Lakes Road. No new access points are being proposed. <br /> Bus traffic will be routed around the perimeter of the entire building, in a clockwise direction. Other <br /> vehicular traffic will be routed around the building, as well as through the shared parking lot. <br /> Staff has received complaints from Spectrum School students regarding safety at both intersections of <br /> Industrial Circle and Twin Lakes Road. No improvements are planned. <br /> Students <br /> The applicant's narrative indicates that the subject building will house up to 100 sixth grade students. <br /> The other school in the development has a capacity, by CUP, of 525 students. Staff recommends that no <br /> more than 100 students be allowed. <br /> Number of Employees <br /> There will be up to 10 staff serving the school. <br /> Hours of Operation <br /> While the hours of operation may change, currently the Student school hours are 8:00 a.m. - 3:20 p.m. <br /> (Monday-Friday during the school year) <br /> Faculty school hours start at 7:30 a.m. (Monday-Friday during the school year) <br /> School year (End of August through May) <br /> Extracurricular activities 3:30 p.m. - 5:30 p.m. <br /> Architecture <br /> The building materials of the existing building consist mainly of raked insulated precast concrete panels. <br /> Existing overhead doors currently serving what will be the school area are proposed to be filled in with <br /> concrete masonry units. (CMU) The BP zoning district lists CMU as an allowed building material. <br /> Some of these in-fill areas will also have insulated aluminum windows installed. <br /> The elevations do not indicate what color the CMU's will be, but staff recommends that they be the <br /> same color as the wall color they are infilling. <br /> N:ADepartments\Community Development\Planning\Case Files\CUP\CU 14-07 Spectrum\CU 14-07 SR Spectrum PC 03-11-14.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.