My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3 PCSR 03-11-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2014
>
03-11-2014
>
7.3 PCSR 03-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2014 2:32:22 PM
Creation date
3/7/2014 1:38:02 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/11/2014
case
CU 14-09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is required so the City of Elk River can expand their -- __ - <br /> existing treatment facility to meet new effluent permit F, <br /> limits from the MPCA and also accommodate growth. <br /> The new permit limits and planned growth will require m <br /> the City to expand existing processes "" w, <br /> and add new treatment processes. The existing <br /> wastewater treatment facility site is not large enough to <br /> accommodate the proposed improvements and x <br /> Expansion Site <br /> requires the City to expand their facility to the south to , <br /> accommodate the new processes. The expansion of v <br /> the Wastewater Facility will consume an area currently '� <br /> used by GRE for their outdoor storage of materials. <br /> Therefore, ,: <br /> GRE needs to construct another area on their site for <br /> outdoor storage. <br /> Great River Enerty <br /> Plant <br /> What has changed to warrant the zone change? <br /> • <br /> GRE is requesting to expand their property use at this <br /> time due to the City's Wastewater Expansion Project Figure 1- Vicinity;1,1,p <br /> that is set to be constructed in the summer of <br /> 2014 which will eliminate their current outdoor storage ;. <br /> area. <br /> Site , <br /> Is the change consistent with the City of Elk River <br /> Comprehensive Plan? <br /> The City of Elk River's Comprehensive Plan shows the Industrial Land Use <br /> expansion project area for GRE as a part of a large <br /> industrial corridor along the east side of Highway 169. <br /> (See Figure 2) Industrial properties span from Main <br /> Street,just north of the expansion site,south to 165th <br /> Avenue NW. <br /> The site outlined near the northern edge of this industrial <br /> corridor has a future land use of Industrial and is consistent <br /> with the Comprehensive Plan. The proposed use also <br /> contributes to several of the overall goals and Vision <br /> outlined in the Comprehensive Plan; <br /> Page 215 <br /> Great River Energy—Outdoor Storage Narrative <br />
The URL can be used to link to this page
Your browser does not support the video tag.