My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 PCSR 03-11-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2014
>
03-11-2014
>
7.2 PCSR 03-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2014 2:38:49 PM
Creation date
3/7/2014 1:35:28 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/11/2014
case
CU 14-07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Narrative <br /> <br />Project Owner <br /> <br />Spectrum Building Company <br /> <br />Tenant <br /> <br />Spectrum High School <br /> <br />Architects <br /> <br />Rivera Architects, Inc. <br /> <br />Project Overview <br /> <br />This project is the interior remodel of an existing building located at 11044 Industrial Circle <br />th <br />Northeast to provide a facility for the 6 graders at Spectrum High School. Spectrum currently <br />serves a student population of 525 students in grades 6-12, which is capacity per the existing <br />conditional use permit (CUP) for 17796 Industrial Circle NW, and is right across the street. <br /> <br />thth <br />There are several reasons to establish the separate 6 grade center. Demand for enrollment in 6 <br />th <br />grade at Spectrum is much higher than the positions that are open. A separate 6 grade center <br />th <br />will allow a greater number of students to attend Spectrum. The separate 6 grade center will <br />th <br />also enhance the education experience by affording the 6 grade students a year to prepare <br />before transitioning into the rigorous academic environment offered at Spectrum High School. <br /> <br />thth <br />The gymnasium in the 6 grade center will supplement the total education experience for the 6 <br />graders and will also be used for after school sports. The 5,000 square foot warehouse in the <br />business park that is currently being leased for wrestling will no longer be necessary with the <br />addition of the gymnasium. <br /> <br />The facility is currently a building shell with unfinished interior space and includes ten separate <br />condominium units for a total space of 24,520 square feet. About 10,000 square feet will be <br />constructed into a gymnasium, locker rooms, and weight room. The remaining space will be <br />remodeled into seven classrooms, staff lounge, administrative area, commons, storage, <br />th <br />maintenance, restrooms, and a serving kitchen. The 6 grade education center will serve up to <br />100 students. <br /> <br />The project will also include 1.5 acres of land that may be used as a future playfield. The land <br />will currently be left <br />and other jurisdiction regulations. <br /> <br />Spectrum High School Background <br /> <br />Spectrum High School is a public charter high school which received its original charter <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.