Laserfiche WebLink
o <br /> <br />co <br /> <br />Issue: <br /> <br />Co <br /> <br />Issue: <br /> <br />ao <br /> <br />FOR <br /> <br />· Talk with county board <br /> <br />· Political pressures <br /> <br />· Heating the bridge with <br /> steam <br /> <br />AGAINST <br /> <br />· Political pressure from <br /> St. Cloud <br /> <br />· Fog/ice from power plant <br /> <br />Specific goals for the City of Becker 2002-2003: <br /> <br />(1) Continue to work toward achievement of the <br />upgrade of Highway 10 <br /> <br />(2) Promote construction of a river crossing (bridge) <br />from Highway 1-94 to Highway 10. <br /> <br />NOTE: The goals for 2002 and 2003 may prove to be <br />longer term because of the dependency of Becker on <br />MnDOT and other agencies to contribute to the desired <br />long-term outcomes. <br /> <br />Northstar Corridor <br /> <br />Desired long-term outcome: Get a commuter rail station. <br /> <br />Factors working FOR and AGAINST achieving desired <br />long-term outcome: <br /> <br />FOR <br /> <br />AGAINST <br /> <br />· State legislature · State legislature <br /> <br />Specific goal for the City of Becker for 2002-2003: <br /> <br />Continue pursuit of construction of a Northstar Corridor <br />commuter rail station in the City of Becker. <br /> <br />Environmental Issues <br /> <br />Desired long-term outcomes: <br /> <br />(1) Ensure adequate capacity at the wastewater <br /> treatment plant <br /> <br />(2) Ensure adequate/clean water supply for the City of <br /> Becker. <br /> <br /> <br />