Laserfiche WebLink
X <br /> <br />X <br /> <br />Use Permit; in Permitee's February 1, 1993, application for renewal of the <br />Conditional Use Permit; in Pennitee's November 8, 1995, application for <br />renewal of the Conditional Use Penrfit; and in Perrnitee's November 2, 1999; <br /> application for renewal of the <br />Conditional Use Permit; all of which have been provided to the City by the <br />Permittee in support of the application for this Amended Conditional Use <br />Pernait and collectively deschbe the Facility authorized by the Permit. The <br />Facility consists ofth2ee (3) integrated components located in the City: (1) A <br />facility for receiving municipal solid waste and processing it into refuse- <br />derived fuel (Processing Facility); (2) ~ facility fc~r the inei~rati6n ~£~e <br />3~¢ed ~i i¢~: facility) i and (3) 5~ :lTl0 ~el; eh(0 fvehi ~1 es:tra~p;~i~g <br />municipal solid waste (MSW), refuse-derived fuel (RDF), rejected municipal <br />solid waste (Rejects), and incineration re~iduc ~h r, ~:.~..^ <br /> ( ........Ash). So long as <br />RDF is incinerated in the City, the conditions of this Permit which relate to <br />the Bum Facility and RcM&ac ~{h shall be in full force and effect. <br />Construction or operation in violation of any of the material statements of <br />fact, factual infomaation, or representations in the referenced documents shall <br />be deemed to be a violation of the Permit and all such documents are <br />considered to be and are hereby made a part of the Permit. <br /> <br />Building construction, driveways, parking, grading, utilities, surface water <br />management, erosion control, landscaping, fencing, and screening for the <br />Processing Facility shall be provided substantially in accordance with the <br />plans submitted by Northern States Power Company with the original <br />application of a conditional use permit and the November 28, 1989 application <br />for renewal of conditional use penrtit, which are herby made a part of this <br />Penrdt. In addition, these plans shall be further revised to provide a hard <br />surfaced, diked area to drop hot loads of processed RDF so that they can be <br />put out and fire suppression water retained; and to further provide that all <br />areas on the facility site are either hard surfaced parking and drive areas, pea <br />rock or asphalt shavings for equipment storage, or landscaped areas with <br /> <br />All utility and street construction plans and specifications as presented by <br />Northern States Power Company for the Facility and servicing streets must be <br />prepared by a Registered Civil Engineer in accordance with directions of and <br />approved by the City Engineer. <br /> <br />All building plans and specifications must be approved by the City Building <br />Inspector and Fire Chief. <br /> <br />Approval of driveway entrances, if needed, on State and County highways <br />shall be secured from the appropriate agencies and filed with the City g-om~ <br /> Administrator prior to issuance of any building <br /> <br />s: ~b&z \ stever ~nrgcup.doc 2 <br /> <br /> <br />