Laserfiche WebLink
i <br /> Stiikethi2aughs to be removed <br /> Underlines to be added <br /> I, <br /> (3) The type of < or sigii Si?n structure as defined in this chapter. <br /> (4) A site plan showing the proposed location of the sigft S'itni along with the <br /> locations and square footage areas of all existing s sSi,nis on the saine <br /> premises. <br /> (5) Structural details as required. <br /> (6) The building official, at their discretion. inay reciLdre r)Ians prepared!?X-a <br /> structural engineer to veri.fy structural.and wind load requirements. <br /> (d) Fee. All applications for permits filed with the city administrator, or designee, shall be <br /> accompanied by a payment of the initial perinit fee for each sig nSi •in in such ainount <br /> as determined by city e titi ordinance. <br /> (e) Issuance or denial. The city administrator, or designee, shall issue a permit for the <br /> erection, alteration, change of copy or relocation of a s5 within 30 days of <br /> receipt of the completed application and applicable fees,provided that the sigma Siam <br /> complies with all applicable laws and regulations of the city. In all applications,where <br /> a matter of interpretation arises, the snore specific definition or higher standard shall <br /> prevail.When a perinit is denied by the city administrator, or designee,written notice <br /> shall be provided to the applicant along with a brief statement of the reasons for <br /> denial. The city administrator, or designee, may suspend or revoke an issued permit <br /> for any false statement or misrepresentation of fact in the application. <br /> (i) Failure to obtain permit. If any sigftSi is installed or placed on any property prior to <br /> receipt of a permit, the specified permit fee shall be doubled. However,payment of <br /> the doubled fee shall not relieve any person of any other requirement or penalties <br /> prescribed in this subidivi-,o-iordinance. <br /> § 30-861 (a) — (b), Inspections: <br /> (a) Any person performing the erection, alteration, or relocating a si- Sion for which a <br /> permit has been issued shall notify the building official upon completion of the <br /> work. The building official may require a final inspection,including an electrical <br /> inspection and inspection of footings on est. clitrg sig"S Freestanding signs. <br /> (b) The building official may require in writing,upon issuance of a permit,that he be <br /> notified for inspection prior to the installation of certain siginsSig s. <br /> i <br /> i <br /> I <br /> i <br /> 10 <br /> I <br />