My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10. PRSR
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2002
>
11-13-2002
>
10. PRSR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2014 3:15:57 PM
Creation date
2/7/2014 3:15:56 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
11/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If we are going to close the 2003 budget gap, we are going to have to look at the additional <br /> personnel services that are being requested. Attached is a personnel services page which <br /> shows the new positions and additional work hours that are still in the 2003 budget proposal. <br /> It may not seem like we are adding many staff hours or positions, but we need to remember <br /> that included in the 2003 budget are expenses for positions that were unbudgeted but added in <br /> 2002. These positions include the Information Technology position, the Environmental <br /> Assistant position, and increasing a Recreation Programmer position from half time to full- <br /> time. These additional expenses that were not in the 2002 budget are slightly offset by the <br /> elimination of the Drug Officer position that was in the 2002 budget, but which is no longer <br /> in the 2003 budget. In reference to the attached personnel services page, I think that the most <br /> vulnerable positions are the Truck Enforcement Officer ($23,250) and the Cable TV Assistant <br /> position ($17,300). Next in line would be the Police Secretary/Receptionist ($8,150), reducing <br /> the Recreation Building Supervisor ($9,000), and elimination of the Fire Specialist position <br /> ($9,900). The above five changes in personnel services equals $67,600. <br /> 1 am not necessarily recommending that all of the requested personnel noted in the above <br /> paragraph be eliminated, but I do think that some of them have to be eliminated in order to <br /> achieve a balanced budget. You need to know that if there are no additional hours for the <br /> Cable TV program, then we will simply be maintaining our existing system and not expanding <br /> programs. Also, if the Lions Park Center is used to the extent that we hope, then we will be <br /> short on hours that will be needed to supervise this facility during the evenings. The Fire <br /> Prevention Specialist is also a very desirable position and any hours that can be dedicated to <br /> this program will be beneficial. <br /> Another item to consider in trying to balance the 2003 budget is the capital outlay item that <br /> remains in the general fund budget. Attached are proposed capital outlay expenditures for <br /> 2003. (Also attached is the 2002 capital outlay page for comparison purposes.) Most of the <br /> Voice Playall System expense in the general fund could be eliminated and not purchased or <br /> this item could be approved and moved to equipment reserves. However,if there are no <br /> capital outlay expenses in the general fund budget in 2003, it makes it difficult to have$50,000 <br /> or so of capital expenses in the general fund in 2004. I don't believe it is a good practice to not <br /> have any capital outlay expenditures in the annual general fund operating budget. <br /> Another note regarding the items on the capital outlay page is the Truck Enforcement <br /> expenditure in the amount of$57,200. If the Truck Enforcement position is eliminated then <br /> this expense is also eliminated. However, if this equipment and truck are eliminated, then the <br /> Police Department would like to add another marked squad. Even with this additional squad, <br /> the equipment certificate amount would go down by $27,400, which would bring the total <br /> expenditure for equipment certificates to just under $330,000. <br /> I have already gone through the initial budget requests and made over$40,000 in reductions in <br /> various departmental line items so it will be hard to "sharpen the pencil" much more. <br /> Nonetheless, there was a sheet distributed on August 26, 2002, that was tided "Last resort <br /> budget options" so everyone should know that we can make cuts into some programs. Asking <br /> me to identify another $5,000 or so in reduction would not be too difficult. However, finding <br /> another $10,000 in cuts would lead me to start looking at: the $10,000 Arts Contribution, the <br /> $9,000 tree coupon program, the $95,000 street overlay/seal coating program, the $5,000 <br /> optical imaging contract for Police, the $10,000 snow removal contractual service program, <br />
The URL can be used to link to this page
Your browser does not support the video tag.