Laserfiche WebLink
ENGINEERS ESTIMATE <br /> <br /> PROJECT: LIONS PARK CENTER PARKING LOT <br /> <br /> OWNER: CITY OF ELK RIVER <br /> <br />ENGINEER: HOWARD R. GREEN COMPANY <br /> <br />ITEM <br /> <br />NO. <br /> <br />ITEM DESCRIPTION <br /> <br />UNIT QTY UNIT PRICE <br /> <br />TOTAL PRICE <br /> <br />CONCEPTA <br /> <br /> SCHEDULE 1.0 -PARKING LOT <br /> MOBILIZATION <br /> <br />2 CLEARING <br /> <br />3 GRUBBING <br /> <br />4 AGGREGATE BASE CLASS 5 <br /> <br />5 TYPE MV 4 WEARING COURSE MIXTURE <br /> <br />6 TYPE MV3 NON WEARING COURSE MIXTURE <br /> <br />7 BITUMINOUS MATERIAL FOR TACK COAT <br /> <br />8 4" SOLID LINE WHITE, EPOXY <br /> <br />9 CONCRETE MEDIAN <br /> <br />SCHEDULE 1.0 - PARK AND RIDE PARKING LOT--TOTAL <br /> <br /> SCHEDULE 2.0- ALTERNATE <br /> <br /> MOVE ELECTRICAL BOX <br /> <br />2 AGGREGATE BASE CLASS 5 <br /> <br />3 TYPE MV 4 WEARING COURSE MIXTURE <br /> <br />4 TYPE MV3 NON WEARING COURSE MIXTURE <br /> <br />5 BITUMINOUS MATERIAL FOR TACK COAT <br /> <br />SCHEDULE2.0-ALTERNATE--TOTAL <br /> <br />LS 1 $3,000.00 $3,000.00 <br />TREE 1.00 $500.00 $500.00 <br />TREE 1.00 $500.00 $500.00 <br />TON 430 $10.00 $4,300.00 <br />TON 120 $40.00 $4,800.00 <br />TON 120 $40.00 $4,800.00 <br />GAL 50 $2.00 $100.00 <br />LF 820 $0.50 $410.00 <br />SF 862 $4.00 $3,448.00 <br /> <br />$21,858.00 <br /> <br />LS 1 $2,000.00 $2,000.00 <br />TON 95 $10.00 $950.00 <br />TON 27 $40.00 $1,080.00 <br />TON 27 $40.00 $1,080.00 <br />GAL 11 $2.00 $22.00 <br /> <br />$5,132.00 <br /> <br />CONSTRUCTION SUBTOTAL $26,990.00 <br /> <br /> <br />