Phase 6 Preliminary Cost Estimate <br />Item <br />Description <br />Unit <br />Qty. <br />Unit Cost <br />Total Cost <br />Total <br />$ <br />5,295,840.00 <br />Contingency (20 %) <br />$ <br />1,059,168.00 <br />SITE WORK <br />$ 25,500.00 <br />6,355,008.00 <br />Mobilization <br />LS <br />1 <br />$ 17,000.00 <br />$ 17,000.00 <br />Staking and Layout <br />LS <br />1 <br />$ 8,500.00 <br />$ 8,500.00 <br />STRUCTURE <br />$ 4,200,000.00 <br />Commercial Building <br />SF <br />52,000 <br />$ 80.00 <br />$ 4,160,000.00 <br />Trail Head and Picnic <br />EA <br />2 <br />$ 20,000.00 <br />$ 40,000.00 <br />HARDSCAPE <br />$ 481,400.00 <br />Driveway <br />SF <br />42000j <br />$ 5.00 <br />$ 210,000.00 <br />Parking <br />SF <br />9600 <br />$ 5.00 <br />$ 48,000.00 <br />Concrete Pavement <br />SF <br />10000 <br />$ 6.00 <br />$ 60,000.00 <br />Pedestrian Lighting <br />EA <br />20 <br />$ 3,000.00 <br />$ 60,000.00 <br />8' wide Bit. Trail <br />SF <br />22400 <br />$ 3.50 <br />$ 78,400.00 <br />Miscelleanous <br />LS <br />1 <br />$ 25,000.00 <br />$ 25,000.00 <br />SOFTSCAPE <br />$ 107,500.00 <br />Zone A <br />AC <br />15 <br />$ 1,500.00 <br />$ 22,500.00 <br />Zone B <br />AC <br />15 <br />$ 1,500.00 <br />$ 22,500.00 <br />Zone C <br />AC <br />7.5 <br />$ 1,500.00 <br />$ 11,250.00 <br />Zone D <br />1 " Bare Root and 5' Hl <br />EA <br />350 <br />$ 75.00 <br />$ 26,250.00 <br />Miscellaneous <br />LS <br />1 <br />$ 25,000.00 <br />$ 25,000.00 <br />Subtotal <br />$ <br />4,814,400.00 <br />Soft Cost (10 %) <br />$ <br />481,440.00 <br />Total <br />$ <br />5,295,840.00 <br />Contingency (20 %) <br />$ <br />1,059,168.00 <br />$ <br />6,355,008.00 <br />Note' Soft cost includes site engineering design and planning, consulting fees. <br />Elk River Landfill End Use \taster Plan 16 11 RS <br />Waste Management, Inc. September 2002 <br />