Laserfiche WebLink
B. Project Cost <br />The project costs presented here are preliminary costs and are based on the park elements <br />illustrated in the master plan. This preliminary costs are intended to serve as a general <br />guide to overall park redevelopment and will need to be updated as more specific plans <br />and specifications available. <br />The preliminary cost estimates are provided in two versions — the overall preliminary cost <br />and each of the six phasing cost estimates. <br />Elk River Landfill End Use Master Plan 29 URS <br />Waste Management, Inc. September 2002 <br />