My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.B.2. PRSR 07.10.2002
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2002
>
07-10-2002
>
9.B.2. PRSR 07.10.2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 12:10:27 PM
Creation date
2/6/2014 12:10:26 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
7/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the plat, replat, or subdivision is presented to the City <br /> Council for approval of the final plat, as determined by the <br /> City Assessor in the same manner as he determines the fair <br /> market value of land for tax purposes. <br /> 7 . In addition, in every plat, replat, or subdivision of land, <br /> the land required for public streets, regional storm water <br /> holding ponds and wetlands shall be set aside and dedicated <br /> on the plat by the owners to the City for these purposes. <br /> These areas will not be credited towards park dedication <br /> requirements. <br /> 8. The suitability of land proposed to be dedicated for park <br /> and recreational purposes shall be determined by reference <br /> to the following criteria: <br /> a) reasonably located and suited for its intended use. <br /> b) shall have frontage on public or private roads as <br /> determined by the City. <br /> c) size, shape, topography, geology, hydrology, tree <br /> cover, access, location. <br /> d) consistency with the goals and objectives of the <br /> Master Park and Recreation Plan. <br /> 9. As part of the subdivision or plat approval, the tract owner <br /> or owners shall be responsible for making certain <br /> improvements to land dedicated for park, trail and public <br /> open space purposes including, but not limited to, finish <br /> grading, ground cover, construction of trails and clearly <br /> identifying park and trail boundaries with City approved <br /> markers. <br /> 10. Park dedication credit shall not be granted for the <br /> construction of recreational facilities unless specifically <br /> approved by the City Council. The submission for review by <br /> staff and the Park and Recreation Commission shall include <br /> an estimate of installation costs, equipment specifications <br /> and a site plan. The Park- and Recreation Commission shall <br /> review such improvements for appropriateness with the Park <br /> and Trail Master Plan. <br /> 11. As part of the application procedure at the time of <br /> preliminary plat, the tract owner or owners are encouraged <br /> to confer with City staff and the Park and Recreation <br /> Commission to secure a recommendation as to the location of <br /> any property that should be dedicated to the public for park <br /> and recreation purposes. <br /> 12 . As part of any park dedication of land, a survey at a scale <br /> of 1 inch = 50 feet shall be provided with topographic data, <br /> based on City datum, including contours at vertical <br /> intervals of at least (2) feet, water courses, wetland, <br /> marshes, rock outcrops, easements, utilities and vegetative <br />
The URL can be used to link to this page
Your browser does not support the video tag.