Laserfiche WebLink
AMT UNIT RATE TOTAL <br /> 01/15/2014 Remove snow around pit 4 trucks @ 3hrs each 12 hr 34.94 $419.28 <br /> 2 loaders @ 3hrs each 6 hr 34.94 $209.64 <br /> 2 blades @ 3hrs each 6 hr 34.94 $209.64 <br /> 2 blowers @ 3hrs each 6 hr 34.94 $209.64 <br /> 1 skidsteer 6 hr 34.94 $209.64 <br /> 1 single axle salt truck 6 hr 34.94 $209.64 <br /> 01/15/2014 Streets Laborer (rink attendant) 8 hr 25.52 $204.16 <br /> 01/16/2014 2 loaders plow fairgrounds lot @ 2.5hrs each 5 hr 34.94 $174.70 <br /> 01/16/2014 Assembled signs 2 hr 34.94 $69.88 <br /> 2 hr 20.35 $40.70 <br /> 01/16/2014 Streets Laborer (rink attendant) 8 hr 25.52 $204.16 <br /> 01/17/2014 Cut and weld sign bases 2 hr 27.40 $54.80 <br /> 01/17/2014 Remove snow around pit 4 trucks @ 2hrs each 8 hr 34.94 $279.52 <br /> 2 loaders @ 2hrs each 4 hr 34.94 $139.76 <br /> 1 blades @ 3hrs each 3 hr 34.94 $104.82 <br /> 1 blowers @ 3hrs each 3 hr 34.94 $104.82 <br /> 1 single axle salt truck 2 hr 34.94 $69.88 <br /> 01/17/2014 Streets Laborer (rink attendant) 8 hr 25.52 $204.16 <br /> 01/19/2014 Streets Laborer (rink attendant) 6 hr 25.52 $153.12 <br /> 01/20/2014 Streets Laborer (rink attendant) @ Holiday rate 6 hr 38.28 $229.68 <br /> 01/20/2014 Plow Main/Norfolk after barricades removed @ Hol. Rate 3 hr 52.41 $157.23 <br /> 01/21/2014 Remove signage after event 2 hr 34.94 $69.88 <br /> $9,752.52 <br /> Hourly rates include 30°oOH <br /> Laborer$25.52 Holiday rate 38.28 <br /> Maint Oper$34.94 Holiday rate 52.41 <br /> Maint Oper$27.40 <br /> Ofc Assts $ 20.35 <br /> 2 <br />