Laserfiche WebLink
City Council Minutes Page 14 <br /> April 17,2006 <br /> ----------------------------- <br /> 10. THERE SHALL BE A MINIMUM CLASSIFICATION OF SEMI CUT- <br /> OFF LIGHTING FIXTURES INSTALLED. • <br /> MOTION CARRIED 5-0. <br /> Easement Vacation <br /> MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY <br /> COUNCILMEMBER FARBER TO ADOPT RESOLUTION 06-43 FOR <br /> VACATING DRAINAGE AND UTILITY EASEMENTS, CASE NO. EV 06-01. <br /> MOTION CARRIED 5-0. <br /> The Council took a 10 minute recess at 8:10 p.m. <br /> 6.13. Resolution to Vacate Portion of Perpetual Bank Protection Maintenance Easement,Public <br /> Hearing-Case 1V6.EV 06-02 <br /> Mr. Harlicker stated an easement to protect the bank along the Mississippi River needs to be <br /> vacated as it encroaches in the building area of the Bluff Block in the downtown <br /> revitalization project area. Mr. Harlicker stated the easement is superseded by the Wild and <br /> Scenic ordinance and will not interfere with the protection of the river. <br /> Mayor Klinzing opened the public hearing.There being no one to speak to this issue,Mayor <br /> Klinzing closed the public hearing. • <br /> MOVED BY COUNCILMEMBER FARBER AND SECONDED BY <br /> COUNCILMEMBER MOTIN TO ADOPT RESOLUTION 06-44 FOR <br /> VACATING A PERPETUAL BANK PROTECTION MAINTENANCE <br /> EASEMENT, CASE NO. EV 06-02. MOTION CARRIED 5-0. <br /> 6.14. School Street/High School Parking Lot Signalization Bid Award , <br /> Mr. Maurer stated bids have been received for the School Street/High School parking lot <br /> signalization improvement project. He stated the low bid was from Design Electrical <br /> Contractors in the amount of$147,077.Mr. Maurer further stated overhead is estimated at <br /> 20 percent,resulting in a total project cost of$176,492.40. <br /> MOVED BY COUNCILMEMBER FARBER AND SECONDED BY <br /> COUNCILMEMBER MOTIN TO ADOPT RESOLUTION 06-45ACCEPTING <br /> BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER <br /> OF THE SCHOOL STREET/HIGH SCHOOL PARKING LOT <br /> SIGNALIZATION IMPROVEMENT OF 2006. MOTION CARRIED 5-0. <br /> 6.15. 193rd Avenue Corridor Update <br /> Mr. Maurer presented a cost and land acquisition analysis of the four possible options for <br /> 193rd Avenue to continue from TH 169 as an east/west corridor to CSAH 13. He reviewed <br /> how land acquisition,temporary grading easements,building removal,relocation costs,and <br /> road construction costs would affect each option. He stated Option 4 is least likely to <br />