Laserfiche WebLink
City of <br /> Elk _ <br /> River <br /> MEMORANDUM <br /> TO: Mayor and City Council <br /> FROM: Phil Hals, Street/Park Superintendent <br /> DATE: February 28, 2003 <br /> SUBJECT: YAC fields 5 & 6, 2002 Construction <br /> In September of 2000, a local contractor graded,leveled, and spread topsoil- <br /> NSP Funds $11,650.00 <br /> In May of 2001, final dirt work was contracted- NSP Funds $ 2,650.00 <br /> In 2002, Street/Park employees leveled,roto-tilled and fine graded the two ball fields. They also <br /> installed a storm sewer line,irrigation equipment,and seeded the grass. <br /> The 2002 Park Dedication expenditures to date have been: <br /> • Irrigation Equipment $8,581.32 <br /> • Grass Seed 1,491.00 <br /> • Fertilizer 225.00 <br /> • Storm Sewer Pipe 3,861.00 <br /> • Storm Sewer Install by Big Jon's 624.00 <br /> • Equipment: United Rental 743.00 <br /> • Equipment: Greenberg's Rental 320.00 <br /> $15,845.36 <br /> 2002 City Donations to date: <br /> • Labor—storm sewer and irrigation install—266 hrs. @ $25/hr $ 6,650.00 <br /> • Tractor—rototilling,leveling, dragging& seeding— 180 hrs @ $40/hr 7,200.00 <br /> • Grader—leveling—63 hrs. @ $75/hr 4,725.00 <br /> • Loader—Additional topsoil—90 hrs. @ $90/hr 8,100.00 <br /> • Trucks—additional topsoil—64 hrs. @ $32/hr $ 4,800.00 <br /> • Surveying—20 hrs. @ $32/hr 640.00 <br /> $32,115.00 <br /> Cost of YAC fields #5 & #6 to date $62,260.36 <br /> . <br />