My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.3. PRSR 04-09-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2003
>
04-09-2003
>
9.C.3. PRSR 04-09-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 11:01:30 AM
Creation date
1/29/2014 11:01:29 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
4/9/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> Elk _ <br /> River <br /> MEMORANDUM <br /> TO: Mayor and City Council <br /> FROM: Phil Hals, Street/Park Superintendent <br /> DATE: February 28, 2003 <br /> SUBJECT: YAC fields 5 & 6, 2002 Construction <br /> In September of 2000, a local contractor graded,leveled, and spread topsoil- <br /> NSP Funds $11,650.00 <br /> In May of 2001, final dirt work was contracted- NSP Funds $ 2,650.00 <br /> In 2002, Street/Park employees leveled,roto-tilled and fine graded the two ball fields. They also <br /> installed a storm sewer line,irrigation equipment,and seeded the grass. <br /> The 2002 Park Dedication expenditures to date have been: <br /> • Irrigation Equipment $8,581.32 <br /> • Grass Seed 1,491.00 <br /> • Fertilizer 225.00 <br /> • Storm Sewer Pipe 3,861.00 <br /> • Storm Sewer Install by Big Jon's 624.00 <br /> • Equipment: United Rental 743.00 <br /> • Equipment: Greenberg's Rental 320.00 <br /> $15,845.36 <br /> 2002 City Donations to date: <br /> • Labor—storm sewer and irrigation install—266 hrs. @ $25/hr $ 6,650.00 <br /> • Tractor—rototilling,leveling, dragging& seeding— 180 hrs @ $40/hr 7,200.00 <br /> • Grader—leveling—63 hrs. @ $75/hr 4,725.00 <br /> • Loader—Additional topsoil—90 hrs. @ $90/hr 8,100.00 <br /> • Trucks—additional topsoil—64 hrs. @ $32/hr $ 4,800.00 <br /> • Surveying—20 hrs. @ $32/hr 640.00 <br /> $32,115.00 <br /> Cost of YAC fields #5 & #6 to date $62,260.36 <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.