Laserfiche WebLink
Winter Equipment Repairs <br /> This winter has been very tough on the trailer camera and audio cable reels. We have had to <br /> repair the reels quite a few times and replace numerous connectors both on the cables and on our <br /> access panel. The new cameras have been working great and the volunteers seem to love them. <br /> As Mark will detail, it has been a very busy winter season for shoots. We have increased the <br /> number of holiday concerts and sporting events which has allowed us to keep the programming <br /> on the channel fresh. <br /> The winter storms have also affected the city channels more then usual this year. The Charter <br /> techs have been very responsive to our calls when we have problems and have kept down time to <br /> a minimum. <br /> Cable and Power Access Panels <br /> As I mentioned previously we have been installing electrical and cable access panels in <br /> commission buildings where we do frequent shoots. We already have them in several city halls <br /> and are also adding them to gymnasiums and other event facilities. <br /> These provide us with faster setup times,easier access to electrical power, make it safer for staff <br /> and the public with long cable runs and also give us a connection to the Internet. <br /> We are starting the 2nd phase of our interconnection at the Elk River Hockey arena. The city is <br /> allowing us to link with the fiber that they have run to the arena. We will be able to link back to <br /> Elk River City Hall from there and also potentially to our S WTV l9 head end and other <br /> communities. <br /> yes, <br /> $i <br /> ID 4st: <br /> f <br /> • - �l <br /> 3 <br />