Laserfiche WebLink
EXHIBIT B <br /> CONDITIONS OF APPROVAL <br /> Approve by resolution the final plat for Aggregate Commercial 2nd, subject to the following <br /> conditions. <br /> 1. Access control shall be dedicated from Lot 1, Block 1. <br /> 2. No increase in storm water onto MnDOT right of way <br /> 3. Any access to Highway 169 shall be approved by MnDOT. <br /> 4. Except for the north 100' of the west property line of Lot 1 Block 1, as indicated on the <br /> plat, Highway 169 access to and from the plat shall be limited to Outlot C. <br /> 5. A variance (V13-10) will need to be recorded prior to the plat being recorded. <br /> 6. The development shall meet all applicable fire codes. <br /> 7. A wetland buffer of 25 feet applies to all wetlands and a structure setback of 20 feet <br /> from the buffer applies. An exhibit shall be prepared and included in the literature <br /> provided to potential buyers. <br /> 8. Wetland boundaries shall be posted in a manner acceptable to the city. <br /> 9. A 25-foot easement adjacent to the outside edge of delineated wetlands to note, <br /> preserve and protect the required no-touch buffer. <br /> 10. A NPDES permit is required prior to final approval of construction drawings. <br /> 11. All required subdivision/park information shall be provided in an electronic format <br /> (.dwg file) as required by the city ordinance and land use application prior to <br /> recording of the plat. <br /> 12. This approval of the preliminary plat shall expire after 1 year, unless the property <br /> owner or owner's agent has submitted a final flat or letter of request for extension. <br /> 13. A Surface Water Management fee for 12.75-acres (the undeveloped portion of the new <br /> ERX site), minus the area of delineated wetlands, in the amount required by the city <br /> at the time of final plat release be paid prior to releasing the plat for recording. The <br /> current 2014 rate is $1,287/acre. <br /> 14. The necessary drainage and utility easements shall be dedicated on the plat as <br /> required by the city. <br /> 15. Grading and erosion control plan and development plan be submitted and approved <br /> by the city engineer prior to the issuance of building permits. <br /> 16. Park dedication shall be provided in the following manner: <br /> a. In the form of cash for 12.75-acres (the undeveloped portion of the new ERX <br /> site), minus the area of delineated wetlands, at the rate applicable at the time <br /> of final plat approval. The current 2014 industrial rate is $2,485 per acre. <br /> P O W E R E D 0 Y <br /> 1`4 f U <br />