Laserfiche WebLink
I ,Ii <br /> zfz <br /> / eA <br /> 4:1 SLOP <br /> 200' <br /> / BUFFER <br /> 4:1 SLOPE <br /> 4LNRE 221ST S�ff7 � eszisss <br /> II <br /> 1 <br /> 9 <br /> 3:1 SLOPE <br /> / e I <br /> ffi 1NOTES: s� <br /> 1. BOUNDARY INFORMATION FROM JAMES R. g <br /> HILL, INC., AND SUNDE LAND SURVEYING. <br /> 2. RECLAMATION OF THE SITE WILL BE 970.5 <br /> PERFORMED IN GENERAL CONFORMANCE TO / <br /> THIS PLAN. <br /> 3. EXCAVATIONS WILL BE BS <br /> NEEDED TO CREATE FINISHED SHED SLOPES SLOPEES THAI <br /> WILL NOT EXCEED 4:1, EXCEPT ALONG <br /> McCROSSAN"S WEST PROPERTY LINE <br /> ADJACENT TO POWER LINES.. <br /> 4. THE FUTURE ALIGNMENT AND ASSOCIATED <br /> RECLAMATION GRADES ALONG 221ST STREET 4:1 SLOPE / <br /> ARE CONCEPTUAL AND SUBJECT TO FINAL <br /> DESIGN. <br /> 5. A MINIMUM OF 3" OF TOPSOIL WILL BE <br /> PLACED OVER SLOPES. THE SLOPES WLISH <br /> ILL <br /> AN <br /> BE SEEDED D MULCHED TO ESTAB 990 <br /> VEGETATION. VEGETATION WILL BE �� <br /> PERIDICALLY INSPECTED TO ENSURE THAT IT I <br /> HAS BECOME SELF—SUSTAINING. <br /> I <br /> 'V SHEET NO. <br /> RECLAMATION PLAN TME ""de <br /> 150 <br /> C3 Tiller Corporation <br /> 150 300 nre,,,a,a rzEG 1p.na,z � s <br /> 2013 Permit Amendment i/9/zou <br />