My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-2013 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2010 - 2019
>
2013
>
12-10-2013 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 3:09:24 PM
Creation date
1/16/2014 3:09:23 PM
Metadata
Fields
Template:
City Government
type
PCM
date
12/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Minutes Page 3 <br /> December 10,2013 <br /> There being no further public comment, Chair Anderson closed the public hearing. <br /> Chair Anderson asked if the Commission had any concerns to add the washing <br /> operation to the Conditional Use Permit request,and if they were comfortable with <br /> staff working out the details with the city's environmental consultant. Commissioner <br /> Eric Johnson stated he would be comfortable with staff working with the consultant. <br /> Commissioner Mike Keefe asked who was responsible for constructing the road <br /> access improvements. Mr.Barnhart stated that the applicant and benefitting entities <br /> will be responsible for installing the haul road and acceleration lane improvements. <br /> Motion by Commissioner Mike Keller and seconded by Commissioner Eric <br /> Johnson to recommend approval of the request by Plaisted Companies for a <br /> Conditional Use Permit for mineral excavation and the WCA Notice of <br /> Decision,with the following conditions: <br /> 1. The applicant shall execute a Conditional Use Permit Agreement <br /> outlining the terms and conditions of approval of the mining operations. <br /> 2. A mineral extraction license shall be obtained annually. <br /> 3. The haul route shall be improved to a compacted gravel surface <br /> acceptable to the city engineer. The haul route may be modified based on <br /> the Highway 169 access location. <br /> • 4. Safety improvements as required by MnDOT shall be completed at 215`h <br /> prior to hauling. No hauling via 217`'or 219`h is permitted. <br /> 5. A letter of credit in the amount of$155,318 shall be provided to ensure <br /> wetland mitigation is completed for the 155,318 sq. ft. of impacted <br /> wetlands. <br /> 6. Approval of this Conditional Use Permit shall expire if activity has not <br /> commenced within 2 years of the date of approval, or if the uses ceases for <br /> a period of 6 months or longer. Failure to obtain an annual license will be <br /> evidence of cessation of use. <br /> 7. Setbacks of 25 feet from north and south property lines, and 50 feet from <br /> east and west property line shall be maintained. No mining activity shall <br /> be permitted within without staff approval. <br /> 8. Buffering and or screening shall be installed when directed by the City. <br /> Motion carried 4-0. <br /> 4.3 Request by BWB Holdings, LLC/ERX Properties, LLC for Preliminary <br /> Plat Approval (continued to January 14, 2014 meeting) <br /> Mr. Barnhart explained that this item was not ready for review and will be presented <br /> at the January 14th meeting. <br /> Chair Anderson opened the public hearing. No comments were received from the <br /> audience. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.