Howard R. Green Company <br />Project No. 806550J <br /> <br />Feasibility Study 175th Avenue Improvements <br /> City of Elk River <br /> <br />Permits <br />Several permits will be required prior to construction of the proposed improvements. <br />Required permits include, but are not limited to, the following: <br /> <br />· Minnesota Pollution Control Agency <br /> <br />· Minnesota Department of Health <br /> <br />· Minnesota Pollution Control Agency <br /> <br />Sanitary Sewer <br />Watermain <br />Grading <br /> <br />VII. ESTIMATED PROJECT COST <br /> <br />The estimated construction costs and associated overhead costs for the proposed <br />improvements are summarized in Table 2 below. In accordance with the City's <br />assessment manual, the overhead costs have been estimated at 28% of the total <br />construction cost. The overhead cost includes city administration, engineering design, <br />construction staking and inspection, and fiscal and legal costs. Right-of-way costs were <br />listed in the previous section and are not included below. <br /> <br /> Table 2 <br /> Project Cost Estimate <br />Sanitary Sewer Improvements <br /> Estimated Construction Cost $ 92,700 <br /> Contingency (5%) 4,600 <br /> Total Construction Cost $ 97,300 <br /> Administration, Engineering, Fiscal & Legal 27,200 <br /> Subtotal: $124,500 <br /> <br />Watermain Improvements <br /> <br /> Estimated Construction Cost <br /> Contingency (5%) <br /> Total Construction Cost <br /> Administration, Engineering, Fiscal & Legal <br /> <br /> Subtotal: <br /> <br />$130,900 <br />6,500 <br />$137,000 <br />38,500 <br />$175,900 <br /> <br />6 <br /> <br /> <br />