My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. SR 07-08-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
07/08/2002
>
5.7. SR 07-08-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:51 AM
Creation date
7/17/2002 4:30:42 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/8/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R. Green Company <br />Project No. 806550J <br /> <br />Feasibility Study 175th Avenue Improvements <br /> City of Elk River <br /> <br />Permits <br />Several permits will be required prior to construction of the proposed improvements. <br />Required permits include, but are not limited to, the following: <br /> <br />· Minnesota Pollution Control Agency <br /> <br />· Minnesota Department of Health <br /> <br />· Minnesota Pollution Control Agency <br /> <br />Sanitary Sewer <br />Watermain <br />Grading <br /> <br />VII. ESTIMATED PROJECT COST <br /> <br />The estimated construction costs and associated overhead costs for the proposed <br />improvements are summarized in Table 2 below. In accordance with the City's <br />assessment manual, the overhead costs have been estimated at 28% of the total <br />construction cost. The overhead cost includes city administration, engineering design, <br />construction staking and inspection, and fiscal and legal costs. Right-of-way costs were <br />listed in the previous section and are not included below. <br /> <br /> Table 2 <br /> Project Cost Estimate <br />Sanitary Sewer Improvements <br /> Estimated Construction Cost $ 92,700 <br /> Contingency (5%) 4,600 <br /> Total Construction Cost $ 97,300 <br /> Administration, Engineering, Fiscal & Legal 27,200 <br /> Subtotal: $124,500 <br /> <br />Watermain Improvements <br /> <br /> Estimated Construction Cost <br /> Contingency (5%) <br /> Total Construction Cost <br /> Administration, Engineering, Fiscal & Legal <br /> <br /> Subtotal: <br /> <br />$130,900 <br />6,500 <br />$137,000 <br />38,500 <br />$175,900 <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.