Laserfiche WebLink
Table 2 <br />Screening of Potential Improvements by Current Issue Area (NCDA decision 10/1/98) <br /> <br />Potential Improvements Anoka/ Elk Big CSAH Becker TH 25 Clear St. Rice <br /> Ramsey River Lake 11 Issue Issue Lake Cloud Issue <br /> Issue Issue Issue Issue Area Area Issue Issue Area <br /> Area Area Area Area Area Area <br />1. Add Right or Left Turn Lanes <br />2. ITS Technologies for Traffic Management <br />3. Access Consolidation/Frontage Rd. Development <br />4. Signal Improvements/Signal Coordination <br />5. Add Thru Lanes orHOVLanes Drop Drop Drop Drop Drop Drop Drop Drop <br />6. Construct Interchanges at Key Locations Drop Drop Drop Drop Drop Drop Drop Drop <br />7. Construct Bypass Drop Drop Drop Drop Drop Drop Drop Drop Drop <br />8. Fully Controlled Access Freeway Drop Drop Drop Drop Drop Drop Drop Drop Drop <br /> <br />Drop - Eliminate from further consideration <br /> <br />TH 10 Minor Improvements include items 1 through 4 <br />TH 10 Moderate Improvements include items 5 and 6 <br />TH 10 Major Improvements include items 7 and 8 <br /> <br />NORTHSTAR CORRIDOR MIS October 30, 1998 <br /> <br /> <br />