My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5. ERMUSR 01-14-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
01-14-2014
>
2.5. ERMUSR 01-14-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2014 3:08:51 PM
Creation date
1/15/2014 3:08:51 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: Any additional repair costs beyond the scope of the Central A/C Tune-Up procedure will <br /> be the responsibility of the homeowner. <br /> Other Energy Efficiency Measures: <br /> CAP may coordinate the purchase, delivery, and installation of a variety of other low-cost energy <br /> efficiency measures that are deemed appropriate. These energy efficient measures could include <br /> but would not be limited to the following items: <br /> • water pipe insulation <br /> • water heater insulation <br /> • window film <br /> • Caulk <br /> • weather stripping <br /> • energy efficient shower heads <br /> • faucet aerators <br /> • water temperature gauges <br /> • furnace filters <br /> • minor structural repairs (not to exceed $200.00) <br /> • motion sensors or timers on exterior fixtures <br /> • ENERGY STAR®rated LED night light <br /> ERMU will reimburse CAP up for these energy savings measures on a case-by-case basis. <br /> 7 <br /> 63 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.