My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 01-14-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
01-14-2014
>
6.1. ERMUSR 01-14-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2014 3:05:24 PM
Creation date
1/15/2014 3:05:24 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Tom Sagstetter- Conservation and Key Accounts <br /> John Dietz—Chair Manager <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> January 14, 2014 6.1f <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Metal Craft will be participating in our Generator program in 2014. They have installed a <br /> 450 kW generator and will be able to drop off the ERMU distribution system during peak <br /> times. By dropping off the system they will be able to lower their monthly demand <br /> charges. <br /> • The landfill gas plant had engines#3 and #4 replaced on December 18`h. A total of three <br /> engines were installed in December and production is back up to historical levels. The <br /> next engine to be replaced will be engine#1 in 2016. The Star News ran an article online <br /> about the engine replacement. The article is attached. <br /> • ERMU issued over$67,000 in energy efficient rebates in December. The last quarter of <br /> the year always has the highest rebates. The largest rebates this year went to ISD 728 for <br /> the installation of two chillers and variable frequency drives for the water pumps of the <br /> chiller. <br /> • Updated 2014 commercial and residential rebate forms. The C&I forms are available <br /> online and by request. The residential rebate form along with LED and CFL coupons <br /> have been printed to be mailed to all residential electric customers. <br /> ATTACHMENT: <br /> • Star News article: "Landfill gas plant replaces three engines" <br /> E. ► e u n i . I t <br /> Page 1 of 1 NATURE <br /> Reliable PEtIlo <br /> Power Provider POWERED T o S E R V E <br /> 156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.