My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.A. ERMUSR 12-17-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
12-17-2013
>
6.1.A. ERMUSR 12-17-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:16:24 PM
Creation date
1/15/2014 11:54:26 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River z <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Wade Lovelette—Superintendent of Technical <br /> John Dietz—Chair Services <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 17, 2013 6.1d <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • The Locating department had a total of 213 locate tickets in November; seven of <br /> them being emergency tickets, three cancelations, seven meets, 176 normal tickets, <br /> one non-excavation, one boundary survey and 18 updated tickets. <br /> • In November, the Security Systems Department had a total of 78 phone contacts, 10 <br /> systems quoted, four system sales made, seven installs completed, 21 service calls <br /> and 10 personal visits. Attached is some financial information from the Security <br /> Systems Department. <br /> • Electric Technicians continue with the meter reading, power bill, substation checks <br /> and off-peak issues. They continue to change out the three phase meters to radio read <br /> meters. They completed the annual oil samples from the substation transformers and <br /> are awaiting the results. <br /> • The power plant staff did the monthly run of the engines. The engines ran good with <br /> no problems. <br /> • Staff continues to collect data with the GPS for our ArcView maps as time permits. <br /> • Steve and Jeff are done directional boring for the season. Jeff is now conducting <br /> infrared tests on our electric system and Steve is catching up on power plant <br /> maintenance. <br /> ATTACHMENTS: <br /> • Security Systems Financial Information <br /> ® INALURE1 Page 1 of 1 <br /> Reliable Public <br /> Power Provider POWERED To SERVE <br /> 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.