My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 11-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
11-12-2013
>
6.1. ERMUSR 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:22:06 PM
Creation date
1/15/2014 11:31:40 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The landfill expansion is beginning to look more promising. I have had frequent <br /> discussions with Waste Management and it appears that the expansion is gaining <br /> momentum internally. I am also exploring the addition of combined heat and power <br /> (CHP) for electric generation at the facility. The technology would use the waste heat <br /> from the engines to boil water to make steam and turn a secondary generator to create <br /> electricity. This seems to be very popular with policy makers and could increase <br /> production from the existing and new engines. <br /> • Energy City tours have been popular. Provided a landfill tour to GRACO and will be giving a <br /> tour of the GRE processing and power plant this week. The GRACO tour had 10 engineers that <br /> were primarily interested in the operations of the landfill and power plant(specifically pumps and <br /> motors). The tour of the processing facility and power plant will be for 35 individuals from <br /> Spectrum High School. The class is interested in environmental issues and how technology helps <br /> improve the environment. <br /> • Billing corrections to Demand Billed customers. The October bills were calculated using an <br /> upgraded version of Power Manager. The upgraded software had two unintended changes when <br /> applied to the ERMU version of Power Manager. First,the Demand Billed(rate class 15) <br /> customers saw an additional line added to their bill that was labeled"Low Load Factor Credit 5". <br /> This line rounded the total energy bill up to next whole dollar. The second unintended change <br /> was increasing the sales tax charged on the same Demand Billed customers. The only billing <br /> errors discovered at this point have been to the Demand Billed customer class and staff is spot <br /> checking all rate classes to ensure no other additional charges have occurred with the software <br /> upgrade. <br /> ATTACHMENTS: <br /> • Article: "LES Gas-To-Energy Plant Goes On-Line Nov. 1" <br /> Page 2 of 2 IIIIEREI <br /> 11 <br /> NATURE <br /> Reliable Public <br /> Power Provider POWERED To SFRVE <br /> 130 <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.