My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 11-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
11-12-2013
>
6.1. ERMUSR 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:22:06 PM
Creation date
1/15/2014 11:31:40 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Johnson tower has been drained for the winter. We originally were going to take a <br /> chance and leave water in it; however after consulting with engineers, we were a little <br /> concerned that the tower may not get enough water transition with the lower use through <br /> the winter months. Not enough use with a tower can cause ice buildup and not allow <br /> enough fresh water to move through the system. With future building we may be able to <br /> leave the Johnson Tower active year round. <br /> ATTACHMENTS: <br /> • Article: "Minnesota's Groundwater: Is our use sustainable?" <br /> • Pictures of Well #4's pump as it was being removed <br /> R .►W IOEAEO 11 <br /> �$ Page 2 of 2AuR� <br /> Reliable P O W E E E O T o S E R V E <br /> 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.