My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 11-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
11-12-2013
>
6.1. ERMUSR 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:22:06 PM
Creation date
1/15/2014 11:31:40 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission David Berg—Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 12, 2013 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • The water department pulled well#4's pump as it needed maintenance. Eric took some great <br /> pictures that really showed how much this maintenance was needed. A meager test was <br /> performed on the well motor when it was pulled out. It only measured at .07 and it should be <br /> closer to 200, so the motor will be sent to Arizona for repair. The pump will be assessed and <br /> repaired by Renner& Sons Inc. The two pipes that are deepest down will also have to be replaced <br /> because of holes and bad threads. <br /> • Irrigation meters are coming in to be stored over winter. They will be cleaned and tested <br /> for flow before they are picked up for spring reinstallation. <br /> • Angela has been organizing the water maps to prepare them for scanning them this <br /> winter. By scanning them, we will be able to tie the maps to the GPS mapping system. <br /> She has also been working with Mike and Gene on the electric department's GPS <br /> mapping. <br /> • We had an intern from St. Cloud Technical College—Water& Wastewater Program at <br /> the end of October. The intern was able to work with each one of the employees on <br /> different water tasks throughout his week of job shadowing. <br /> • Pete finished working with Bolton-Menk to assist with finding valves to GPS. He also <br /> finished installing steel fence posts to mark gate valves. This helps to locate valves <br /> faster in the event of a water main break. <br /> • The hydrant maintenance is finished for the season, Angela and Pete painted and 252 <br /> hydrants. <br /> la WERE , IT <br /> Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W F R E a T o S E R V E <br /> 101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.