My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 11-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
11-12-2013
>
6.1. ERMUSR 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:22:06 PM
Creation date
1/15/2014 11:31:40 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 12, 2013 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had thirteen new services. <br /> • Finished changing out a few of our older rusty live front switchgear. The new switchgear <br /> is dead front and safer to work on. <br /> • Finished rebuilding Troy and Union Street. We still have to pull some poles when <br /> Charter gets their wire off our poles. <br /> • Finished the first parts of feeder 94 rebuild. The first part of this job is removing the <br /> overhead three phase rear lot line that is located between School St. and Gates Ave. <br /> • Continue working on the second part of feeder 94 rebuild. We are installing primary wire <br /> to loop the transformers for the businesses east of Gates Ave. <br /> • After getting the new substation transformer at the north substation site back on line and <br /> the 69kv breaker changed out at the Waco substation, we had to put the feeders back to <br /> normal. <br /> • Started working on the Triple Deck Feeder rebuild. Underground Piercing got all of the <br /> pipe bored in and is now working on getting the wire pulled in the pipe. We have the new <br /> poles set along Main St. and are working on getting new wire pulled in. <br /> ® <br /> Page 1 of I INAJUREI <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.