My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 PCSR 01-14-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2014
>
01-14-2014
>
4.5 PCSR 01-14-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2014 12:26:13 PM
Creation date
1/10/2014 12:26:13 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Water Pollution: <br /> The site is operated in compliance with all applicable Minnesota Pollution Control <br /> Agency and Department of Natural Resources regulations for the protection of water <br /> quality. A National Pollution Discharge Elimination Permit (NPDES) will be obtained for <br /> the site. Fuel if stored on-site, will be stored in above ground tanks with secondary <br /> containment provided in accordance with MPCA regulations. <br /> f. Topsoil: <br /> Topsoil is retained on the site until the completion of restoration. Topsoil has been used <br /> to create screening berms and these berms may subsequently be removed as part of the <br /> final reclamation process. <br /> g. Slopes: <br /> The active mining face will be sloped no steeper than 1:1. Reclaimed slopes will be <br /> backfilled to a maximum slope of 4:1 or to maximum slope approved for landfill <br /> construction. <br /> Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.