My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 PCSR 01-14-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2014
>
01-14-2014
>
4.6 PCSR 01-14-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 11:13:13 AM
Creation date
1/10/2014 10:47:01 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 10,2014. <br /> Page 6 of 8 <br /> of the mine where it will be managed to promote infiltration. Erosion control practices include: (1) <br /> Routing on-site storm water flows to naturally occurring retention areas.(2)Creating channels to <br /> facilitate item number one. (3)Creating berms and other obstacles to facilitate item number one. <br /> The site has appropriate equipment and machinery to implement appropriate erosion control <br /> practices on an immediate and as-needed basis. <br /> Silt fencing will be used as needed for erosion and sediment control along perimeter areas that <br /> may temporarily drain off-site during stripping, overburden removal and berm construction. <br /> Where possible, a vegetative buffer of five to ten feet will be left intact between the silt fence <br /> and the mining area to provide initial filtering and sediment removal prior to runoff reaching <br /> the silt fence. <br /> (10)A comprehensive rehabilitation plan showing suitable provisions for rehabilitation of the <br /> excavated area to a useable condition compatible with the adjacent land such that it will <br /> not become a health or safety hazard or a nuisance. Such plan shall, at a minimum, <br /> include anticipated final elevations, slopes and plans for the return of vegetation, subsoil <br /> and topsoil.Where the council deems practical and necessary, such plan shall also include <br /> adjoining related areas where extractions have previously been made which remain under <br /> the control of the applicant or the owner of the land on which the extraction is proposed. <br /> Comment: <br /> The information is provided on pages 7 and 8, and the Reclamation Plan, C3 of the <br /> application. The requirement for Topsoil Preservation (Sec. 42-96) is not addressed. The Plan <br /> of Operation must identib,the volumes of soils required for reclamation and the future <br /> locations of soil stockpiles. <br /> Final slopes on the northern portion of the Site and the west property boundary of the <br /> southern parcel for McCrossan are indicated as 3:1 slopes, which exceed the required <br /> maximum of 4:1. This may be acceptable, however the thickness of topsoil will need to be <br /> increased and provisions for drainage/erosion control need to be addressed. Erosion control <br /> measures for slope areas where surface water runoff is concentrated must be identified. <br /> The reclamation plans require the backfilling of soil from the mining grade to the final <br /> contours. An earthwork balance assessment of soil volumes for reclamation must be provided <br /> by the applicant to insure that sufficient volumes of soil are maintained onsite to meet the <br /> reclamation earthwork needs. <br /> The Reclamation Plan indicates future potential roadways. The north-south frontage road in <br /> the southern portion of the Site indicates a grade as steep as 20%. The plan should be <br /> modified to accommodate a typical roadway grade. <br /> The Reclamation Plan does not indicate the specifics related to revegetation of the mined <br /> areas. <br /> Response: <br /> Topsoil for reclamation: <br /> All topsoil shall be retained onsite until completion of all reclamation work in accordance with the <br /> reclamation plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.