My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-16-2013 CCM
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2010-2019
>
2013
>
12-16-2013 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:14:18 PM
Creation date
1/7/2014 2:37:01 PM
Metadata
Fields
Template:
City Government
type
CCM
date
12/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City Council Minutes Page 3 <br /> December 16,2013 <br /> Mayor Dietz opened the public hearing. There being no one to speak to this issue, <br /> Mayor Dietz closed the public hearing. <br /> Moved by Councilrnember Burandt and seconded by Councilrnember <br /> Westgaard to approve the Preliminary Plat with the following conditions: <br /> 1. Access restriction shall be placed along Highway 10. <br /> 2. Development agreement shall be signed outlining costs and <br /> responsibilities to the satisfaction of the city attorney. <br /> Motion carried 5-0. <br /> Moved by Councilrnember Motin and seconded by Councilrnember <br /> Westgaard to adopt Resolution 13-78 granting Final Plat approval for Heritage <br /> Maples, Case No. P 13-03,with the following conditions: <br /> 1. Access restriction shall be placed along Highway 10. <br /> 2. Development agreement shall be signed, outlining costs and <br /> responsibilities to the satisfaction of the City Attorney. <br /> 3. A letter of credit or other security acceptable to the city be provided in the <br /> amount of 100% of the cost of public improvements. <br /> 4. Upon completing all of the improvements and having them accepted by <br /> the city, a warranty bond in the amount of 25% of the improvement costs <br /> shall be submitted to the city for a one year period. <br /> 5. Surface water management fee in the amount required by the city at the <br /> time of final plat be paid prior to releasing the plat for recording. ($208 per <br /> lot, 2013 rate) <br /> 6. Sealcoat fee in the amount to be determined by the city engineer be paid <br /> to the city prior to releasing the plat for recording. <br /> 7. Park dedication shall be paid for the one buildable lot at the rate <br /> applicable at the time the plat is released for recording. <br /> 8. All required wetland and grading permits must be obtained prior to <br /> commencing work on the site. <br /> 9. Grading and erosion control plan and development plan be submitted and <br /> approved by the city engineer prior to the issuance of grading permits. <br /> 10. All grading will need to be certified prior to the issuance of building <br /> permits. <br /> 11. Street lights shall be installed as recommended by Elk River municipal <br /> utilities. <br /> 12. Water availability charge be paid prior to releasing the plat for recording. <br /> 13. Any item or condition found that indicates the site is likely to yield <br /> information important to pre-history or history shall be reported to the city <br /> immediately. Further, the city reserves the right to stop work authorized <br /> in its approval until the site is appropriately investigated and work is <br /> authorized. <br /> POW E 8 E 13 By <br /> NATURE] <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.