Laserfiche WebLink
Capital Improvement Plan 2014 mru 2018 <br /> City of Elk Diver, Minnesota <br /> Project# ST-12 <br /> Project Name Signalization of 193rd Avenue&Evans Street - � r <br /> Type Infrastructure Department hrfrastnrcture Improvements x <br /> Useful Life 20 years Contact Engineers <br /> Category Street Construction Priority n/a <br /> z <br /> Description <br /> Install a signal system including EVP at the intersection of 193rd Avenue and Evans Street.Because of the proximity to TH169,the signal system <br /> must be interconnected with the existing highway signal system. <br /> Justification <br /> The construction of 193rd Avenue(2009)street improvement opens 193rd to CSAH 13 allowing another route to and from TH169. In <br /> anticipation of the increased traffic flow the intersection of 193rd Avenue and Evans Street was constructed to accept a signal system. <br /> Expenditures 2014 2015 2016 2017 2018 Total <br /> Planning/Design 250,000 250,000 <br /> Total 250,000 250,000 <br /> Funding Sources 2014 2015 2016 2017 2018 Total <br /> Municipal State Aid 250,000 250,000 <br /> Total 250,000 250,000 <br /> 2014-2018 CAPITAL IMPROVEMENT PLAN Page 29 <br />