Laserfiche WebLink
Capital Improvement flan 2014 thru 2018 <br /> City of Elk River, Minnesota <br /> Project# IA-02 <br /> Project Name lee Arena Major Building Repair <br /> Type Building Department Ice Arena <br /> Useful Life 20 years Contact Ice Arena Manager <br /> Category Building Maintenance Priority n/a <br /> Description <br /> 2014 projects include: <br /> Replace Barn roof($117,000) <br /> Front entrance doors($12,350) <br /> Barn dehumidifier($185,400) <br /> Vertical cracks to Olympic precast($16,200) <br /> Electronic Air Quality Monitor($13,000) <br /> Justification <br /> The Barn's roof was installed in the early 70's and is well past its life expectancy. The arena is starting to experience several leaks on the south <br /> end. <br /> The interior of the Barn structure will continue to deteriorate without a dehumidifier that is sized correctly for the Barn. <br /> Many of these projects will be prioritized based on a future facility study. <br /> Expenditures 2014 2015 2016 2017 2018 Total <br /> Building Maintenance 343,950 343,950 <br /> Total 343,950 343,950 <br /> Funding Sources 2014 2015 2016 2017 2018 Total <br /> Ice Arena 343,950 343,950 <br /> Total 343,950 343,950 <br /> 2014-2018 CAPITAL IMPRO VEMENTPLAN Page 15 <br />