My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 & 4.5 PCSR 12-10-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
12-10-2013
>
4.4 & 4.5 PCSR 12-10-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2013 2:54:18 PM
Creation date
12/6/2013 2:47:00 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
12/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> October 30, 2013 <br /> Mr. Zachary Carlton <br /> 9. We understand that the pond, sidewalk and street alignment encroach into the buffer area. <br /> We respectfully request consideration to leave the alignment as shown. The present <br /> street alignment provides a best fit traffic connection to the proposed service road. <br /> Security/Operations and Building concerns/responses (Items 10-14) will be addressed by <br /> the applicant. <br /> Landscaping <br /> 15. We have included a revised landscape plan from a registered landscape architect. <br /> 16. We have added headlight screening as requested. The proposed fence is a commercially <br /> available white solid PVC style fence. <br /> 17. Trees have been moved out of the drainage and utility easement. <br /> Sincerely, <br /> OLIVER SURVEYING& GINEERING, INC. <br /> - 1 <br /> Ross D. Abel, PE <br /> cc: Marilyn VanPatten <br /> File: 7179.22-11 <br /> Letters\Herit ge Maples 103013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.