My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 & 4.5 PCSR 12-10-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
12-10-2013
>
4.4 & 4.5 PCSR 12-10-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2013 2:54:18 PM
Creation date
12/6/2013 2:47:00 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
12/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Security/ operations <br /> 10. There is some concern for the residents leaving the property and trying to walk <br /> along/ cross Highway 10. What security measures are in place for the residents? <br /> 11. How many employees are envisioned per shift? <br /> Building <br /> 12. As this project will be developed as PUD, a PUD agreement will need to be <br /> developed. A PUD allows flexibility from the strict requirements of the zoning code, <br /> with the tradeoff being a higher quality development. <br /> 13. Building plans must be developed by a licensed architect. It is strongly suggested <br /> that a meeting be held with the Building Depait.inent to understand the process and <br /> requirements of obtaining a building permit. <br /> 14. It is recommended that the building design echo the design elements of the adjacent <br /> West Oaks development in colors and materials. Alternatively, a different architectural <br /> style can be proposed, for both the subject piece and the western portion. <br /> Landscaping <br /> 15. Landscaping plan must be prepared by a registered landscape architect.A plan <br /> should be developed that provides for interest, screening, and functionality of the <br /> landscaping throughout the neighborhood. <br /> 16. Headlight screening is required adjacent to the parking lot along the south property <br /> line. Please provide a detail. <br /> 17. The placement of any trees in the easement area will need to be evaluated with the <br /> easement language. <br /> It is helpful to provide a written response letter to these comments, along with revised <br /> drawings. If you have any questions I can be reached at 763.635.1034. <br /> Sincerely, <br /> Jeremy Barnhart,AICP <br /> Deputy Director, Community Operations and Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.