Laserfiche WebLink
(2) The street address or location of the property on which the sigiaSi is to be <br /> located, along with the name and address of the property owner. <br /> (3) The type of signSio or sigfiSign structure as defined in this chapter. <br /> (4) A site plan showing the proposed location of the signSi nn along with the <br /> locations and square footage areas of all existing signsSigns on the same <br /> premises. <br /> (5) Structural details as required. <br /> 6 The building official, at their discretion,may require plans prepared by <br /> structural engineer to verify structural and wind load requirements. <br /> (d) Fee. All applications for permits filed with the city administrator, or designee, shall be <br /> accompanied by a payment of the initial permit fee for each signSi nn in such amount <br /> as determined by city ordinance. <br /> (e) Issuance or denial. The city administrator, or designee, shall issue a permit for the <br /> erection, alteration, change of copy or relocation of a sigiaSio within 30 days of <br /> receipt of the completed application and applicable fees,provided that the signSign <br /> complies with all applicable laws and regulations of the city. In all applications,where <br /> a matter of interpretation arises, the more specific definition or higher standard shall <br /> prevail. When a permit is denied by the city administrator, or designee,written notice <br /> shall be provided to the applicant along with a brief statement of the reasons for <br /> denial. The city administrator, or designee, may suspend or revoke an issued permit <br /> for any false statement or misrepresentation of fact in the application. <br /> (f) Refund of fee on denial of permit. If a permit is denied, the permit fee shall be refunded to <br /> the applicant. <br /> (g) Refund of fee on abandonment of permit. If no inspections have been made and no work <br /> authorized by the permit has been performed, 50 percent of the permit fee may be <br /> refunded to the applicant upon request,provided that the permit is returned to the <br /> city administrator, or designee,within 90 days of issuance. <br /> (h) Expiration. A permit issued by the city administrator, or designee,becomes null and <br /> void if work is not completed within 180 days of issuance. If work authorized by the <br /> permit is suspended or abandoned for 180 days, the permit is thereby suspended,but <br /> may be reinstated with an additional payment of one-half of the original fee. <br /> (i) Failure to obtain permit. If any signSi nn is installed or placed on any property prior to <br /> receipt of a permit,the specified permit fee shall be doubled. However,payment of <br /> the doubled fee shall not relieve any person of any other requirement or penalties <br /> prescribed in this subdivisionordinance. <br /> (Code 1982, 900.22(3)(A), (3)(C), (7)(B)—(7)(E); Ord. No. 09-06, � 1, 7-20-2009) <br /> 6 <br />