My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 EDSR 11-18-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2013
>
11-18-2013
>
6.1 EDSR 11-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 10:46:38 AM
Creation date
11/14/2013 4:12:15 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
11/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
may include the following systems and portions of real property: <br /> a. Mechanical heating,plumbing, and electrical <br /> b. Structural;including the facade of the structure and energy related <br /> improvements. <br /> c. Hook-up to city services (i.e. water, sewer) <br /> d. ADA (Americans with Disabilities Act) improvements <br /> 7VI4. LOAN SECURITY AND GUARANTEES <br /> Applicant must be able to secure the loan by providing the EDA with a minimum of <br /> a subordinate mortgage upon the building and/or assets or other approved collateral. <br /> Applicant must demonstrate the financial means to repay the loans, as determined by <br /> the Economic Development Authority. <br /> Whenever possible,personal guarantees will be made part of any loan agreement. <br /> Key person life insurance may be required as determined by the EDA Finance <br /> Committee based on loan amount and company ownership partners. <br /> 8V-114. TIMING OF PROJECT EXPENSES <br /> No project should commence until the Elk River Economic Development Authority <br /> has approved the loan application. Any costs incurred prior to the approval of the <br /> loan application are generally not eligible expenditures. <br /> No building construction should commence until the required city permits are <br /> secured. <br /> The applicant will be responsible for all legal,recording, and other fees required for <br /> protection of a security interest in the loan, payable by a non-refundable 1% <br /> processing fee,which is paid at the time of application. In addition to the <br /> non-refundable 1%processing fee, all legal and filing fees shall be paid by the <br /> borrower at loan closing. <br /> 91X. PROCEDURAL GUIDELINES FOR APPLICATION AND APPROVAL <br /> 1. All applicants shall first contact a primary lending institution to determine if <br /> additional equity is needed, and if so, how much. <br /> 2. The applicant and the primary lender shall then meet with city staff to obtain <br /> information about the Microloan program, discuss the project, and obtain <br /> application forms. <br /> 3. The applicant shall complete and submit an application form to the city, along <br /> with a processing fee of 1% of the loan request. (The fee is used to cover <br /> processing expenses and will be returned only if application is denied.) The <br /> applicant must provide evidence of their ability to meet the equity requirements <br /> or provide a letter of commitment for conventional financing from the primary <br /> Page 7of16 P0 ■ E O E O 0 <br /> NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.